A23 and A27, Multiple Temporary Traffic Restrictions
What is happening?
A23 AND A27 TRUNK ROADS
TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that National Highways has made an Order on the A23 and A27 Trunk Roads in the Counties of East and West Sussex and the Unitary Authority of the City of Brighton and Hove, under Sections 14(1)(a) and 14(1)(c) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on, or in the vicinity of, the road.
The effect of the Order is to: -
1. authorise the overnight closure (in phases) of -
(a) both carriageways of the A23 between Pease Pottage Interchange (M23 Junction 11/A246) and the London Road Roundabout in Patcham;
(b) both carriageways of the A27 between Warblington Interchange (A259) and Pevensey Roundabout (A259);
(c) the slip and link roads leading to and from the carriageways described in 1. (a) and (b) above;
(d) any side road at junction with the lengths of carriageway described in 1. (a) and (b) above;
(e) any bus stop or lay-by adjacent to the lengths of carriageway described in 1. (a) and (b) above;
(f) any gap between the lengths of carriageway described in 1. (a) and (b) above, and any dedicated lane used for the purpose of turning through them.
2. to impose, in sections as required, an overnight ban on overtaking on both carriageways of the A23 and A27 where it is currently permitted on the lengths of carriageway described in 1. (a) and (b) above.
These measures are in the interests of road safety while contractors undertake maintenance and renewal work of a cyclical nature and A23 and A27 project works.
The duration of each closure will vary depending on the nature of the maintenance work being undertaken on each occasion. The programme of works will start on or after 2nd January 2024. The overnight closures will be in operation between 20:00 and 06:00 (maximum period).
Planned maintenance work will be scheduled to avoid disruption during known peak periods, although essential maintenance may be necessary during these periods to prevent the need for emergency works. Please see National Highways website for specific details on any upcoming closures.
The Order will come into force on 2nd January 2024 and remain in force until 24th December 2024.
During the closures, traffic affected will be diverted using other junctions of the A23 and A27, or by using the A259, A264, A270, A272, A281, A283, A284, A293, A2011, A2038, A2270, A2280, A2300, B2036, B2110, B2114, B2115, B2117, B2118, and various local roads. The diversion in operation will vary according to the closure in force, and the diversion roads listed above are the agreed routes, but these may change depending on local conditions.
Access to and from premises accessible from, and only from, the lengths of carriageway to be closed will be permitted under escort. The temporary closures, overtaking bans and diversion routes will be clearly indicated by traffic signs when they are in operation during the works periods.
H Blyth,
an Official of National Highways Ltd. Ref: NH/SE/2024/A23/RNO, A27/RNONational Highways, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@nationalhighways.co.uk.
Need to publish a public notice?
If you need to publish a public notice, please contact Brighton Argus directly at: