Panteg, Temporary Prohibition of Pedestrians
What is happening?
TORFAEN COUNTY BOROUGH COUNCIL ROAD TRAFFIC REGULATION ACT 1984 (AS AMENDED) SECTION 14 (1)(b) PUBLIC FOOTPATH NO. 13/14 AT PANTEG PONTYPOOL TEMPORARY PROHIBITION OF PEDESTRIANS ORDER 2023
NOTICE is hereby given that the County Borough Council of Torfaen in exercise of their powers under the Road Traffic Regulation Act 1984 (as Amended) have made an Order the effect of which will be to prohibit pedestrians and cyclists from proceeding along Public Footpath No. 13/14 at the boundary of the field where the works are to take place, to its junction with Pontyfelin Lane, New Inn. The footpath runs in a north-easterly south-westerly direction for approximately 266 metres (A-B-C on the order plan).
An alternative route has been identified along an existing defined path to the east of the Afon Lwyd and is indicated by a dashed black line A-B on the order plan.
The Order will come into operation 6 December 2023 and will continue in force for a period of 6 months or until the works have been completed, whichever is the sooner.
Dated: 6 December 2023
This Notice is also available in Welsh
Stephen Vickers, Chief Executive, Civic Centre, Pontypool NP4 6YB
CYNGOR BWRDEISTREF SIROL TORFAEN DEDDF RHEOLEIDDIO TRAFFIC FFYRDD 1984 (FEL YM DIWYGIWYD) ADRAN 14 (1)(b) LLWYBR TROED CYHOEDDUS RHIF. 13/14 PANTEG PONT-Y-PWL GORCHYMYN GWAHARDD CERDDWYR DROS DRO 2023
HYSBYSIR trwy hyn fod Cyngor Bwrdeistref Sirol Torfaen wrth arfer ei bwerau o dan y Ddeddf Rheoleiddio Traffig Ffyrdd 1984 (fel y'i diwygiwyd) wedi gwneud Gorchymyn effaith yr hwn fydd gwahardd cerddwyr a seiclwyr rhag mynd ar hyd Llwybr Cerdded Cyhoeddus Rhif 13/14 wrth ffin y cae ble bydd gwaith yn digwydd, hyd at ei gyffordd a Pontyfelin Lane, Y Dafarn Newydd. Mae'r llwybr troed yn mynd i gyfeiriad gogledd dwyreiniol, de orllewinol am tua 266 metr (A-B-C ar gynllun y gorchymyn).
Mae llwybr amgen wedi ei nodi ar hyd llwybr a ddynodwyd eisoes i'r dwyrain o'r Afon Lwyd ac a ddangosir trwy linell gwahanodau du A-B ar gynllun y gorchymyn.
Daw'r Gorchymyn i rym ar 6 Rhagfyr 2023 a bydd yn parhau am gyfnod o 6 mis neu tan fydd y gwaith wedi ei gwblhau, pa un bynnag sydd gynharaf.
Dyddiwyd: 6 Rhagfyr 2023
Mae'r Hysbysiad hwn ar gael yn Saesneg hefyd
Stephen Vickers, Prif Weithredwr, Y Ganolfan Ddinesig, Pont-y-pwl NP4 6YB