Chaul End Lane - Temporary Road Closure
What is happening?
THE BOROUGH OF LUTON
(CHAUL END LANE)
(TEMPORARY ROAD CLOSURE)
ORDER 2023
NOTICE is hereby given that Luton Borough Council, the Highway Authority for the said Borough, on 9th October 2023 made the above Order under the relevant provisions of the Road Traffic Regulation Act 1984 (as amended).
The Order will come into operation on 13th November 2023 for a period of 18 months or when the proposed works have been completed, whichever is the earlier. Anticipated dates of closure 13th November 2023 to 15th November 2023. Specific dates and times will be signed locally. The Order will therefore be in operation during such date and time and to such extent as indicated by traffic signs, barriers or cones.
The effect of the Order will allow the Council to close to vehicular traffic Chaul End Lane from its junction with Dunstable Road to its junction with Hatters Way. Diversion route via Dunstable Road, Birch Link, Dunstable Road, Hatters Way.
The Order is intended to create a window for the works to be done and it is anticipated that the works will be completed over a period within the date described as above. The purpose of the Order is to allow carriageway resurfacing works to be carried out. Access will be maintained as best as possible to properties where this may be done safely whilst such works are being carried out and diversions for traffic will be marked by signs. Details of road closures and diversions can be found at http://www.luton.gov.uk/ roadworks
11th October 2023
Highway Services Manager
Building 14, Central Depot
Kingsway, Luton LU4 8AU