NOTICE is hereby given that Luton Borough Council, the Highway Authority for the said Borough, intends to make the above Order under the relevant provisions of the Road Traffic Regulation Act 1984 (as amended).
The Order will come into operation 1st August 2023 and cease operation after 31st July 2024 or when the proposed football matches have finished, whichever is the earlier. The Order will therefore be in operation when signs are displayed.
The effect of the Order will allow the Council to close to vehicular traffic the following roads and lengths of roads, namely Ash Road from Hampton Road to Maple Road East, Beech Road the whole length, Clifton Road the whole length, Dunstable Road from a point outside of property No.219 to a point outside of property No.239, Hampton Road the whole length, Hazelbury Crescent from Avondale Road to Kenilworth Road, Ivy Road the whole length, Kenilworth Road from Avondale Road westwards to a point outside of the Luton Town Football Club stadium forecourt, Maple Road East the whole length, Oak Road the whole length. Diversion not available. In conjunction with the road closures the Council intends to suspend the one-way restriction on Dunstable Road the length from a point outside of property No.219 to a point outside of property No.239, and on Oak Road the whole length.
The Order is intended to create a window for the Luton Town Football Club matches to take place and it is anticipated that the football matches will take place over a period within the dates described above. The purpose of the Order is to enable the safe passage of highway users attending Luton Town Football Club matches. Pedestrian access will be maintained as best as possible to properties where this may be done safely whilst the football matches are taking place. Details of road closures can be found at http://www.luton.gov.uk/roadworks
5th July 2023
Highway Services Manager
Building 14, Central Depot
Kingsway Luton LU4 8AU
How long will it take?
Planned start
5-Jul-2023
Estimated end
31-Jul-2024