Public Notice Portal - Brought to you by Britain's Local News Media
Statutory

Try our AI Explainer

This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.

Essex - Flood Defence Revetment Maintenance and Repair Works

RM18 7EH•Published 12/11/26
Basildon Echo • 

What is happening?

ENVIRONMENT AGENCY

ANNOUNCEMENT OF INTENTION NOT TO PREPARE AN ENVIRONMENTAL STATEMENT

Regulation 5 of the Environmental Impact Assessment Land Drainage Improvement Works (Amended) Regulations 1999 SI 1999/1783

TILBURY DOCKS REVETMENT MAINTENANCE REPAIR WORKS

The Environment Agency gives notice that it proposes to carry out maintenance repair works to the flood defences in the vicinity of the Port of Tilbury London Limited, Leslie Ford House, Tilbury, Essex, RM18 7EH, between Ordnance Survey Grid Reference points TQ 61814 77060 and TQ 64268 75128.

The Tilbury Revetments project will carry out patch repairs at five areas along the tidal frontage of the port to return the tidal embankments to their target condition grade. The works will involve repairs to damaged areas of the revetement that form the flood defence structure. A temporary compound will be established within the Port of Tilbury and reinstated to its original condition upon completion of the works.

The contractor intends to begin mobilising on 14 December 2026. The repairs will be delivered in phases, with works starting on 04 January 2027 and completion scheduled for 30 September 2027.

The Environment Agency considers that the maintenance repair works are not likely to have significant effects on the environment and does not intend to prepare an Environmental Statement in respect of them. In reaching this determination, the characteristics, location and potential impacts of the proposed works have been taken into account against the selection criteria for maintenance repair works having a significant effect on the environment, as set out in Schedule 2 of the Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999. The repair works fall within the Environment Agency’s permitted development rights.

An Environmental Action Plan will be put in place to manage the risk of environmental harm or disturbance during the works. The plan addresses potential impacts on protected species, flood risk, water quality and local residents, with appropriate measures to be implemented before, during and after repair works. These include strict pollution prevention controls and biosecurity procedures to prevent the spread of invasive non-native species.

With these measures in place, the proposed works are not expected to have a significant effect on the environment. The relevant environmental documents can be obtained from the Project Manager at the address below.

Any person wishing to make representations in relation to the likely environmental effects of the proposed maintenance repair works should do so, in writing, to the address specified below, within 30 days of the date of publication of this notice.

Rishi Seebaruth, Environment Agency, Kings Meadow House, Kings Meadow Road, Reading, Berkshire, RG1 8DQ

Open to feedback

From

12-Nov-2026

To

12-Dec-2026

Need to publish a public notice?

If you need to publish a public notice, please contact Basildon Echo directly at:

se-sales@localiq.co.uk

01268 522792

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 42 million people across the length and breadth of the country each month.

Public Notice PortalNews Media Association