Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Powys - Land Drainage Improvement Works for Upper Wye Catchment Restoration
What is happening?
Cyfoeth Naturiol Cymru
Natural Resources Wales
CYHOEDDIAD O FWRIAD I BEIDIO Â
PHARATOI
DATGANIAD AMGYLCHEDDOL.
Rheoliad 12B Rheoliadau Asesiad o’r
Effaith Amgylcheddol (Gwaith Gwella
Draenio Tir) SI1999/1783
fel y’i diwygiwyd
PROSIECT ADFER DALGYLCH
GWY UCHAF
Mae Cyfoeth Naturiol Cymru yn hysbysu
ei fod yn bwriadu gwneud gwelliannau i’r
draeniad ar nentydd dienw sy’n draenio i
Afonydd Ithon a Gwy ym Mhowys ar Fferm
Brynhoveth (NGR SO 10783 66036), Fferm
Brynhthomas (NGR SO 10731 61770) a Fferm
Tynddol (NGR SN 90177 80031).
Bydd y gwaith gwella arfaethedig yn
cynnwys y canlynol:
• Yn Fferm Brynhoveth, gosod cwlfert (pibell
wal ddwbl 450mm) i ddargyfeirio’r cwrs
dwr o dan drac y fferm yn hytrach na’i
fod yn llifo dros y trac, er mwyn lleihau’r
gwaddod fydd yn cael ei gludo i’r afon.
• Yn Fferm Brynthomas, ffensio’r cwrs dwr i
gadw da byw allan a gosod cwlfert (pibell
wal ddwbl 800mm) i greu man croesi
ffurfiol i dda byw a pheiriannau, er mwyn
lleihau’r silt a’r maethynnau sy’n mynd i’r
afon.
• Yn Fferm Tynddol, gosod cwlfert (pibell
wal ddwbl 800mm) i greu man croesi
ffurfiol i beiriannau, er mwyn lleihau’r silt a’r
maethynnau sy’n mynd i’r afon.
Mae Cyfoeth Naturiol Cymru o’r farn nad
yw’r gwaith gwella yn debygol o gael effaith
sylweddol ar yr amgylchedd ac nid yw’n
bwriadu paratoi datganiad amgylcheddol ar
ei gyfer. Am ragor o wybodaeth, cysylltwch
â rheolwr y prosiect drwy ddefnyddio’r
manylion isod.
Dylai unrhyw un sy’n dymuno cyflwyno
sylwadau mewn perthynas ag effeithiau
amgylcheddol tebygol y gwaith gwella
arfaethedig wneud hynny, yn ysgrifenedig, a’u
hanfon at y cyfeiriad a nodir isod, o fewn 15
diwrnod i ddyddiad cyhoeddi’r hysbysiad hwn.
Brendan Adair (Rheolwr Prosiect),
Cyfoeth Naturiol Cymru, Plas yr Afon,
Parc Busnes Llanelwy, Heol Fortran,
Llanelwy C53 0EY.
E-bost: brendan.adair@cyfoethnaturiolcymru.gov.uk
ANNOUNCEMENT OF INTENTION
NOT TO PREPARE
AN ENVIRONMENTAL STATEMENT.
Regulation 12B of the Environmental
Impact Assessment (Land Drainage
Improvement Works) SI1999/1783
as amended
UPPER WYE CATCHMENT
RESTORATION PROJECT
Natural Resources Wales gives notice that it proposes to carry out improvement works to the drainage on unnamed streams draining into the Rivers Ithon and Wye in Powys at Brynhoveth Farm (NGR SO 10783 66036), Brynthomas Farm (NGR SO 10731 61770) and Tynddol Farm (NGR SN 90177 80031).
The proposed improvement works will involve the following:
• At Brynhoveth Farm, installation of a culvert (450mm twin wall pipe) to divert the watercourse under the farm track rather than flowing over the track, to reduce sediment being transported into the river.
• At Brynthomas Farm, fencing off the watercourse to exclude stock and installation of a culvert (800mm twin wall pipe) to form a formal crossing point for stock and machinery, to reduce silt and nutrient ingress into the river.
• At Tynddol Farm, installation of a culvert (800mm twin wall pipe) to form a formal crossing point for machinery, to reduce silt and nutrient ingress into the river.
Natural Resources Wales considers that the improvement works are not likely to have significant effects on the environment and does not intend to prepare an environmental statement in respect of them. For further information, please contact the project manager on the details below.
Any person wishing to make representations in relation to the likely environmental effects of the proposed improvement works should do so, in writing, to the address specified below, within 15 days of the date of publication of this notice.
Brendan Adair (Project Manager),
Natural Resources Wales, Rivers House,
St Mellons Business Park, Fortran Road,
St Mellons CF3 0EY.
Open to feedback
From
14-Aug-2026
To