Bridgwater, Somerset, Application For Variation Of An Environmental Permit
What is happening?
ENVIRONMENT AGENCY Application for variation of an environmental permit under the Environmental Permitting (England and Wales) Regulations 2016
We've received an application to vary a permit from NNB Generation Company (HPC) Limited.
Application number: EPR/JP3122GM/V012 Type of regulated facility: Water management zones and effluent treatment units serving the Hinkley Point C (HPC) construction site
Address of regulated facility: Hinkley Point C Construction Site, Hinkley Point C power station, Wick Moor Drove, Near Bridgwater, Somerset, TA5 1UD
National grid reference discharge point: Existing discharge permitted via Outlet 12 at NGR ST 19315 46475
Receiving environment: Severn Estuary
Effluent type: Existing permitted discharge of trade effluent consisting of effluent from Cold Commissioning activities (permitted as water discharge activity (WDA) reference I in the current permit). This includes effluents generated from activities such as flushing, hydro-testing, byproducts from demineralised water production from the demineralised water plant and commissioning effluent treatment plant (CETP).
Volume: Existing permitted discharge of 1,500 cubic metres per day (m3/day)
What does the operator want to do?
The proposed variation (change) to WDA reference I is to include:
- The addition of a permitted compliance limit for the discharge of 102 micrograms per litre (pg/l) of total copper
- The addition of a permitted compliance limit for the discharge of 1,200pg/ of free chlorine
- The addition of a permitted compliance limit for the discharge of 140pg/1
of total Zinc
- The addition of multiple constituent treatment chemicals from several cleaning and biofouling prevention products that are required to maintain the efficiency of the demineralised water plant
There are no other proposed changes to this existing WDA (activity reference l), or any other WDAs as part of this permit variation application.
How to view the application
The variation application can be viewed online: https://consult.environment-agency.gov.uk/psc/ta5-1ud-nnb-generation-company-hpc-limited-v012
Please contact us via e-mail at psc-waterquality@environment-agency.gov.uk or contact us on 03708 506 506 to arrange to see the variation application documents if you are unable to access Citizen Space.
How to comment on the application
If you have any comments send these by 6 August 2024.
Online: https://consult.environment-agency.gov.uk/psc/ta5-1ud-nnb-generation-company-hpc-limited-v012
Email: psc-waterquality@environment-agency.gov.uk
Post: The Environment Agency, IPS WQ Team, Quadrant 2, 99 Parkway Avenue, Sheffield, S9 4WF
For advice about how to make a representation or if you are unable to make a representation via our e-consultation tool (Citizen Space) or e-mail please call 03708 506 506.
Please quote the application number in any correspondence.
The Environment Agency will normally put any comments it receives on the public register. This includes your name but not your personal contact details. Please tell us if you do not want your response to be public.
The privacy notice for permit applicants/operators can be viewed at https://www.gov.uk/guidance/environmental-permits-privacy-notice
Find out more about our regulation of the HPC site via our GOV.UK page at the link below:
https://www.gov.uk/guidance/hinkley-point-nuclear-regulation
Open to feedback
From
9-Jul-2024
To
6-Aug-2024
Need to publish a public notice?
If you need to publish a public notice, please contact Bridgwater Mercury directly at: