THE NATIONAL GRID (SEA LINK) ORDER 2026NOTICE OF AUTHORISATION OF COMPULSORY ACQUISITION
What is planned?
THE NATIONAL GRID (SEA LINK) ORDER 2026NOTICE OF AUTHORISATION OF COMPULSORY ACQUISITION
The above Order, made under the Planning Act 2008 by the Secretary of State for Energy Security and Net Zero and published on 30 October 2026, includes provision authorising the compulsory acquisition of land, existing rights over land and of rights over land by creating new rights over it as described in Schedule 1 and more particularly described in the Order and Book of Reference accompanying the Order.
The Order includes provision authorising the acquisition for the purpose of carrying out works within the local authority areas of East Suffolk Council, Thanet District Council and Dover District Council including a connection from the existing transmission network via Friston Substation, constructing underground electricity cabling, construction of approximately 122 kilometres of subsea HVDC cable and installation of two sections of new HVAC overhead line, connecting from the substation near Minster and the existing Richborough to Canterbury overhead line and constructing two new converter stations and various ancillary works.
In summary, the Sea Link project (the “Project”) consists of the following principal components described below:
The Suffolk Onshore Scheme: Works comprised:
•a connection from the existing transmission network via Friston Substation including the substation itself. Friston Substation has development consent as part of other third-party projects. If Friston Substation had already been constructed under another consent, only a connection into the substation would be constructed.
•a High Voltage Alternating Current (“HVAC”) underground cable of approximately 1.9 km in length between Friston Substation and a converter station (see below)
.•a 2 GW HVDC converter station (including permanent access from the B1121 and a new bridge over the River Fromus) up to 26 m high plus external equipment (such as lightning protection, safety rails for maintenance works, ventilation equipment, aerials, similar small scale operational plant or other roof treatment) near Saxmundham.
•a HVDC underground cable connection of approximately 10 km in length between the proposed converter station near Saxmundham and a transition joint bay approximately 900 m inshore from a landfall point (see below) where the cable transitions from onshore to offshore technology.
•a landfall on the Suffolk Coast between Aldeburgh and Thorpeness.
The Offshore Scheme: Works comprising approximately 122 km of subsea HVDC cable, running between the Suffolk landfall location between Aldeburgh and Thorpeness, and the Kent landfall location of Pegwell Bay.
The Kent Onshore Scheme: Works comprising:
•a landfall point on the Kent coast at Pegwell Bay.
•a transition joint bay approximately 800 m inshore to transition from offshore HVDC cable to onshore HVDC cable, before continuing underground for approximately 1.7 km to a new converter station (see below).
•a 2 GW HVDC converter station (including new permanent access off the A256 up to 28 m high plus external equipment such as lightning protection, safety rails and maintenance works, ventilation equipment, aerials, and similar small scale operational plant near Minster. A new substation will be located immediately adjacent; and
•the removal of approximately 2.2 km of existing HVAC overhead line, and installation of two sections of new HVAC overhead line, together totaling approximately 3.5 km each connecting from the substation near Minster and the existing Richborough to Canterbury overhead line.
The Project also includes modifications to sections of existing overhead lines in Suffolk (only if Friston Substation is not built pursuant to another consent) and Kent, diversions of third-party assets, and land drainage from the construction and operational footprint.
It also includes opportunities for environmental mitigation and compensation. The construction phase will involve various temporary construction activities including overhead line diversions, use of temporary towers or masts, working areas for construction equipment and machinery, site offices, parking spaces, storage, accesses, bellmouths, and haul roads, as well as watercourse crossings and the diversion of public rights of way (PROWs) and other ancillary operations.
A hard copy of the Order made by the Secretary of State for Energy Security and Net Zero together with copies of the Secretary of State’s decision letter and the Examining Authority’s report has been deposited at the following locations and may be inspected at the hours set out below:
| Library | Address | Opening hours | Other information |
|---|---|---|---|
| Saxmundham Library | County Offices, Street Farm Road, Saxmundham, IP17 1AL |
Mon: Closed Tue: 09:30 – 17:30 Wed: 09:30 – 17:30 Thu: Closed Fri: 09:30 – 17:30 Sat: 10:00 – 13:00 Sun: 10:00 – 15:00 |
|
| Aldeburgh Library | Victoria Road, Aldeburgh, IP15 5EG |
Mon: 09:00 – 13:00 Tue: 09:00 – 13:00 Wed: 09:00 – 18:00 Thu: 09:00 – 13:00 Fri: 09:00 – 13:00 Sat: 10:00 – 15:00 Sun: 10:00 – 13:00 |
|
| Minster Library | 4a Monkton Road, Minster, Ramsgate, CT124EA |
Mon: 13:00 – 17:00 Tue: 09:30 – 13:30 Wed: Closed Thu: 12:00 – 17:00 Fri: 10:00 – 16:00 Sat: 09:30 – 13:30 Sun: Closed |
|
| Newington Library | 4a Monkton Road, Minster, Ramsgate, CT124EA |
Mon: 09:00 – 13:00 and 14:00 – 17:30 Tue: 09:00 – 13:00 Wed: Closed Thu: 09:00 – 13:00 and 14:00 – 17:30 Fri: Closed Sat: 09:00 – 13:00 Sun: Closed |
Please note that the opening times of the above libraries may be subject to change and it is recommended that you contact the library in advance to check the opening hours.
A copy of the Order as made by the Secretary of State for Energy Security and Net Zero, together with copies of the Secretary of State’s decision letter and the Examining Authority’s report of its recommendations, the Statement of Reasons, the Book of Reference and the Land Plans are available to view online through the Planning Inspectorate’s website at:
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020026
A person aggrieved by the Order may challenge the order only in accordance with section 118 of the Planning Act 2008, which stipulates that any proceeding must be brought by filing a claim form for judicial review during the period of 6 weeks beginning with the day on which the Order was published (or, if later, the day on which the statement of reasons for making the order is published).
Once the provision in the Order authorising compulsory acquisition comes into force, National Grid Electricity Transmission plc (National Grid) may acquire any of the land (including any existing rights and / or new rights) described in Schedule 1 below by executing a general vesting declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981. A statement on the effect of Parts 2 and 3 of that Act is set out in Schedule 2.
Any person who would be entitled to claim compensation if a general vesting declaration were executed is invited to give National Grid information about the person’s name, address, and interest in land, using a prescribed form. The prescribed form is set out in Schedule 3 and should be returned to National Grid at the following address:
Post: Dalcour Maclaren, Unit 2, The Old Grain Store, Moseley’s Farm Business Centre, Fornham All Saints, Bury St Edmunds, Suffolk, IP28 6JY
Email: sealink@dalcourmaclaren.com
Date: 23rd November 2026
Adrian Pierssene
Project DirectorFor and on behalf of National Grid Electricity Transmission plc
SCHEDULE 1
DESCRIPTION OF THE LAND, EXISTING RIGHTS AND NEW RIGHTS
The Order land (as defined in Article 2 of the Order) is shown on the Land Plans (as defined in Article 2 of the Order) and described in the Book of Reference (as defined in Article 2 of the Order) within the local authority areas of East Suffolk Council, Suffolk County Council, Thanet District Council, Dover District Council and Kent County Council. This notice relates to so much of the Order Land as is shown on the Land Plans shaded brown (compulsory acquisition of all interests and rights in land), shaded green (compulsory acquisition of rights - overhead line), shaded orange (compulsory acquisition of rights – underground cable system), shaded grey (compulsory acquisition of rights – construction compound), shaded dark blue (compulsory acquisition of rights – access), shaded purple (compulsory acquisition of rights – drainage) and shaded light blue (compulsory acquisition of rights – mitigation).
Under the powers granted in the Order:
(a)National Grid may acquire compulsorily so much of the Order Land as is specified by Article 24 (compulsory acquisition of land) of the Order for the construction, operation and maintenance and decommissioning of the authorised project (each as defined in Article 2 of the Order) or as is incidental to, or required to facilitate, the authorised development.
(b)National Grid may acquire compulsorily such rights over the Order Land by creating them as well as by acquiring rights already in existence, and imposing restrictions affecting part of the Order Land, as is authorised by Article 25 (compulsory acquisition of rights) of the Order; and
(c)National Grid may acquire compulsorily so much of the subsoil of and airspace over the Order Land as is specified by Article 26 (acquisition of subsoil or airspace only) of the Order as may be required for any purpose for which that land may be acquired under that provision instead of acquiring the whole of the land.
The Order includes powers to extinguish or suspend all private rights and restrictive covenants over the land described in Article 37 and authorises the overriding of easements and other rights in accordance with Article 38.
National Grid may also temporarily use the Order Land to carry out the authorised development (as defined in Article 2 of the Order) pursuant to Article 27 of the Order and may temporarily use the Order Land to maintain the authorised development pursuant to Article 28 of the Order.
DESCRIPTION OF THE ORDER LAND
The Order Land subject to powers of compulsory acquisition is as described in the table below:
In the Suffolk Onshore Scheme
The landscape includes parts of the low-lying and gently undulating coastline comprising marshland and heathland, within the Suffolk Coast and Heaths National Landscape. Further inland, medium to large-scale agricultural fields dominate across relatively higher, undulating land. The landscape within the study area is settled, with a variety of towns, including Leiston and Aldeburgh, smaller villages, including Friston and Knodishall, small clusters of dwellings and scattered properties. The land use within the eastern and southern parts of the study area is largely associated with ecological conservation and comprises large areas of fenland and marshland alongside the coastline and River Alde. The land use within the remainder of the study area is predominantly agricultural and arable crops. The vegetation within the eastern part of the study area typically comprises heathland and scrubland, with large areas of mature woodland vegetation. The vegetation within the southern part of the study area largely consists of low-level scrub associated with the floodplain of the River Alde.
In the Kent Onshore Scheme
The landscape includes low-lying landform within the Ash Levels and Minster Marshes in the southern and central part. This landscape comprises a series of drainage ditches separating small to medium sized field enclosures, within the former Wantsum Channel. The landscape rises towards the settlement of Minster, comprising some larger scale field enclosures. The landscape also includes the low-lying coastal areas extending around Pegwell Bay which are characterised by larger intertidal areas of marsh and mudflat along the coastline. The land use within the study area is largely associated with agriculture, with predominantly pastoral fields particularly adjacent to the various drainage ditches which Sea Link dissect the lower lying marsh and around the watercourses including the River Stour. There are larger arable fields in the surrounding landscape. Orchards are present across the southwestern part of the study area in the higher areas of the Ash Levels. Other land uses include the Richborough Energy Park in the western part of the study area, two golf courses, country park and various solar farms. The vegetation within the Ash Levels and Minster Marshes in the southern and central part of the study area comprises hedgerows and mature individual and linear tree blocks. Within the northern part of the study area, the landscape includes smaller blocks of woodland such as Minster Woods, along with hedgerow planting. The coastal landscape is comparatively more wooded and treed than the remainder of the study area, notably around Richborough Energy Park.
DESCRIPTION OF THE NEW RIGHTS
The following classes of new rights as detailed more fully in the Book of Reference are sought over the land described above for the benefit of the Order Land:
| Class | Colour Land Plans | Description of Class of Right | |
|---|---|---|---|
| 1 | Compulsory Acquisition of land | Brown | Acquisition of all interests and rights in the land |
| 2 | Compulsory Acquisition of Rights – Overhead Line | Green |
Acquisition of rights by the creation of new rights, the imposition of restrictions, or the acquisition of existing rights or benefits of existing restrictions: a) with or without vehicles, plant and equipment to enter the land to construct the overhead electric line and thereafter to use, retain, inspect, maintain, repair, alter, renew and replace or remove; b) with or without vehicles, plant and equipment to enter the land to fell, trim or lop trees and bushes which may obstruct or interfere with the rights sought by the undertaker; c) with or without vehicles, plant and equipment to enter the land to access any adjoining land; d) with or without vehicles, plant and equipment to enter the land to exercise the rights over and across any access route; e) to require the landowner not to do or suffer anything to be done upon the land which may interfere with or cause damage to the overhead electric line, including without limitation impose clearance restrictions, not to erect any building or structure or allow any plant or tree to grow within the land, not to change the level of the surface, ground cover or composition of the land or do or allow to be done anything that may cause the level of the surface, ground cover or composition to be altered, not to drill, dig or break up the land; f) to fly over, use on, and recover from the land robots, helicopters, drones, gadgets or similar devices either remote controlled or autonomous, including for the purposes of inspection and maintenance; g) to construct and install land drains cut-off drainage and/or run-off drainage systems (including all necessary supports) soakaways and attenuation ponds on the land, and thereafter to infill and/or retain and make use of, including from time to time to inspect, cleanse, maintain, repair, remove, reinstate, renew, alter and replace, the same; h) to carry out any other works, including environmental mitigation, necessary or expedient to the land and listed in Schedule 1 of the Order; and I) to carry out any activity’s ancillary or incidental thereto. |
| 3 | Compulsory Acquisition of Rights – Underground Cable System | Orange |
Acquisition of rights by the creation of new rights, the imposition of restrictions, or the acquisition of existing rights or benefits of existing restrictions: a. with or without vehicles, plant and equipment to enter the land to construct the underground cable system and thereafter to use, retain, inspect, maintain, repair, alter, renew and replace or remove; b. with or without vehicles, plant and equipment to enter the land to fell, trim or lop trees and bushes which may obstruct or interfere with the rights sought by the undertaker; c. with or without vehicles, plant and equipment to enter the land to access any adjoining land; d. with or without vehicles, plant and equipment to enter the land to exercise the rights over and across any access route; e. to require the landowner not to do or suffer anything to be done upon the land which may interfere with or cause damage to the underground cable system, including without limitation impose clearance restrictions, not to erect any building or structure or allow any plant or tree to grow within the land, not to change the level of the surface, ground cover or composition of the land or do or allow to be done anything that may cause the level of the surface, ground cover or composition to be altered, not to drill, dig or break up the land; f. to fly over, use on, and recover from the land robots, helicopters, drones, gadgets or similar devices either remote controlled or autonomous, including for the purposes of inspection and maintenance; g. to construct and install land drains cut-off drainage and/or run-off drainage systems (including all necessary supports), soakaways and attenuation ponds on the land, and thereafter to infill and/or retain and make use of, including from time to time to inspect, cleanse, maintain, repair, remove, reinstate, renew, alter and replace, the same; h. to carry out any other works, including environmental mitigation, necessary or expedient to the land and listed in Schedule 1 of the Order; and I. to carry out any activity’s ancillary or incidental thereto. |
| 4 | Compulsory Acquisition of Rights – Construction Compound | Grey |
Acquisition of rights by the creation of new rights, the imposition of restrictions, or the acquisition of existing rights or benefits of existing restrictions: a. with or without vehicles, plant and equipment to enter the land to construct and use the same as a construction compound in connection with the works; b. to install and maintain mitigation measures; c. to carry out works necessary or expedient to the land and listed in Schedule 1 of the Order; and d. to carry out activity’s ancillary thereto. |
| 5 | Compulsory Acquisition of Rights – Access | Dark Blue |
Acquisition of rights by the creation of new rights, the imposition of restrictions, or the acquisition of existing rights or benefits of existing restrictions: a. with or without vehicles, plant and equipment always over the land; b. to remove any buildings, structures, pylons, apparatus, equipment, and vegetation from that land; c. to require the landowner not to do or suffer anything to be done upon the land which may interfere with the undertaker’s access, including without limitation not to erect any building or structure or allow any plant or tree to grow within the land, not to change the level of the surface, ground cover or composition of the land or do or allow to be done anything that may cause the level of the surface, ground cover or composition to be altered, not to drill, dig or break up the land; d. to require the landowner not to do or suffer anything to be done upon the land which may interfere with sight lines associated with the undertaker’s access, including without limitation not to erect any building or structure or allow any plant or tree to grow within the land insofar as it may interfere with sight lines, not to change the level of the surface, ground cover or composition of the land or do or allow to be done anything that may cause the level of the surface, ground cover or composition to be altered, not to drill, dig or break up the land; e. to construct, use or maintain works including the provision of means of access); f. to construct and install land drains cut-off drainage and/or run-off drainage systems (including all necessary supports), soakaways and attenuation ponds on the land, and thereafter infill and/or to retain and make use of, including from time to time to inspect, cleanse, maintain, repair, remove, reinstate, renew, alter and replace, the same; and g. to carry out activity’s ancillary thereto. |
| 6 | Compulsory Acquisition of Rights – Drainage | Purple |
Acquisition of rights by the creation of new rights, the imposition of restrictions, or the acquisition of existing rights or benefits of existing restrictions: a. with or without vehicles, plant and equipment to enter the land to construct and install land drains, cut off drainage and/or run-off drainage systems (including all necessary supports), soakaways and attenuation ponds on the land and the means of access to them; b. thereafter to infill and/or make use of, including from time to time to inspect, cleanse, maintain, repair, remove, reinstate, renew, alter and replace, the same (including the means of access); c. to carry out activity’s ancillary thereto; and d. to require the landowner not to do or suffer anything to be done upon the land which may interfere with the drainage systems, soakaways or attenuation ponds, including without limitation not to erect any building or structure or allow any plant or tree to grow within the land insofar as it may interfere with the drainage systems, not to change the level of the surface, ground cover or composition of the land or do or allow to be done anything that may cause the level of the surface, ground cover or composition to be altered, not to drill, dig or break up the land; |
| 7 | Compulsory Acquisition of Rights – Mitigation | Light blue |
Acquisition of rights by the creation of new rights, the imposition of restrictions, or the acquisition of existing rights or benefits of existing restrictions: a. with or without vehicles, plant and equipment to enter the land to construct and install mitigation measures (including all necessary supports) on the land and the means of access to them; b. thereafter to retain and make use of, including from time to time to inspect, cleanse, maintain, repair, remove, reinstate, renew, alter and replace, the same (including the means of access); c. to carry out activities ancillary thereto and d. to require the landowner not to do or suffer anything to be done upon the land which may interfere with the mitigation measures, including without limitation not to erect any building or structure or allow any plant or tree to grow within the land insofar as it may interfere with the mitigation measures, not to change the level of the surface, ground cover or composition of the land or do or allow to be done anything that may cause the level of the surface, ground cover or composition to be altered, not to drill, dig or break up the land; |
SCHEDULE 2
STATEMENT ON THE EFFECT OF PARTS 2 AND 3 OF THE COMPULSORY PURCHASE (VESTING DECLARATIONS) ACT 1981
Power to execute a general vesting declaration.
1.Once the provisions in The National Grid (Sea Link) Development Consent Order 2026 which authorise compulsory acquisition, come into force National Grid (hereinafter “the Acquiring Authority”) may acquire any of the land (including any existing rights and / or new rights) described in Schedule 1 above by executing a general vesting declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 (“the Act”). This has the effect, subject to paragraphs 3 and 5 below, of vesting the land in the Acquiring Authority at the end of the period mentioned in paragraph 2 below.
Notices concerning general vesting declaration.
2.As soon as may be after the Acquiring Authority executes a general vesting declaration, they must serve notice of it on every occupier of any of the land specified in the declaration (except land where there is one of the tenancies described in paragraph 4) and on every person who gives them information relating to the land in pursuance of the invitation contained in this Notice of the Authorisation of Compulsory Acquisition published and served under section 134 of the Planning Act 2008. When the service of notices of the general vesting declaration is completed, a period specified in the declaration, of not less than three months, will begin to run. On the first day after the end of this period the land described in the declaration will, subject to what is said in paragraphs 3 and 5, vest in the Acquiring Authority together with the right to enter on the land and take possession of it. Every person on whom the Acquiring Authority could have served a notice to treat in respect of his interest in the land (other than a tenant under one of the tenancies described in paragraph 4) will be entitled to claim compensation for the acquisition of his interest in the land, with interest on the compensation from the vesting date
.3.The “vesting date” for any land specified in the declaration will be the first day after the end of the period mentioned in paragraph 2 above unless a counternotice is served under Schedule A1 to the Act within that period. In such circumstances, the vesting date for the land which is the subject of the counternotice will be determined in accordance with Schedule A1.
Modifications with respect to certain tenancies
4.In the case of certain tenancies, the position stated above is subject to modifications. The modifications apply where the tenancy is either a “minor tenancy,” i.e., a tenancy for a year or a yearly tenancy or a lesser interest, or “a long tenancy which is about to expire.” The latter expression means a tenancy granted for an interest greater than a minor tenancy but having on the vesting date a period still to run which is not more than the period specified in the declaration for this purpose (which must be more than a year). In calculating how long a tenancy has still to run, where any option to renew or to terminate it is available to either party, it shall be assumed that the landlord will take every opportunity open to him to terminate the tenancy while the tenant will use every opportunity to retain or renew his interest.
5.The modifications are that the Acquiring Authority may not exercise the right of entry referred to in paragraph 2 in respect of land subject to a tenancy described in paragraph 4 unless they first serve notice to treat in respect of the tenancy and then serve every occupier of the land with a notice of their intention to enter and take possession after the period (not less than three months from the service of the notice) specified in the notice. The right of entry will be exercisable at the end of that period. The vesting of the land will be subject to the tenancy until the end of that period or until the tenancy ends, whichever happens first.
SCHEDULE 3
FORM FOR GIVING INFORMATION ON THE NATIONAL GRID (SEA LINK) ORDER 2026
To: National Grid Electricity Transmission PLC (c/o Dalcour Maclaren, Unit 2, The Old Grain Store, Moseley’s Farm Business Centre, Fornham All Saints, Bury StEdmunds, Suffolk, IP28 6JY) or by email: sealink@dalcourmaclaren.com.
[I] [We] being [a person] [persons] who, if a general vesting declaration were executed under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 in respect of all the land comprised in the order cited above in respect of which notice to treat has not been given, would be entitled to claim compensation in respect of [all] [part of] that land, give you the following information, pursuant to section 134(7) (cza)(ii) of the Planning Act 2008.
I/We believe that I/We are/are entitled to notice if temporary powers are to be exercised over the land referred to in the heading to this notice.
1.Name and address of informant(s)(i)..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
2.Land in which informant (s) holds an interest.(ii).........................................................................................................................................................................................................................................................................................................................................................................................................................................................
3.Nature of interest(iii)...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Signed......................................................................................................................................................................
On behalf of
Date
(i) In the case of a joint interest inserting the names and addresses of all the informants
(ii)The land should be described concisely.
(iii)If the land is leasehold, the date of commencement and length of term should be given. If the land is subject to a mortgage or other encumbrance, details should be given, e.g., name of building society and roll number.
How long will it take?
Planned start
26-Nov-2026
Estimated end
26-Dec-2026
Open to feedback
From
26-Nov-2026
To
26-Dec-2026
Need to publish a public notice?