Neigh Bridge Somerford Keynes - Announcement of Intention Not to Prepare an Environmental Statement
What is planned?
ENVIRONMENT AGENCY
ANNOUNCEMENT OF INTENTION NOT TO PREPARE AN ENVIRONMENTAL STATEMENT Regulation 5 of the Environmental Impact Assessment Land Drainage Improvement Works (Amended) Regulations 1999 SI 1999/1783
Capital works on debris screen
The Environment Agency gives notice that it proposes to carry out improvement works to a flood defence asset at Neigh Bridge Somerford Keynes, Cotswold District, Gloucestershire, England, GL7 6DJ, (NGR SU0187194784). The works will include replacing and improving the existing debris screens to ensure CIRIA compliance, improving access for maintenance, and carrying out minor works to the surrounding riverbank and vegetation. Temporary works within the Somerford Keynes Old Drainage Ditch may also be required during construction. A temporary compound 200m² will be situated in the field adjacent to the site.
The Environment Agency considers that the improvement works are not likely to have significant effects on the environment and does not intend to prepare an environmental statement in respect of them. Outlined as selection criteria for improvement works having a significant effect on the environment in Schedule 2 of The Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999 the characteristics, location and potential impact have been taken into account in this determination.
Due to the site’s proximity to the Cotswold Water Park SSSI, a SSSI assessment form has been prepared, determining no potential for significant impact to the SSSI.
An Environmental Action Plan, informed by an Environmental Assessment Matrix, has been prepared to account for any risk of environmental harm or disturbance during the works. The plan addresses potential impacts on protected species, trees, flood risk, water quality and residents, with measures implemented before, during and after construction, as appropriate. These measures include strict pollution prevention controls and biosecurity procedures to prevent the spread of invasive non-native species.
It is considered that the proposed works will not have a significant effect on the environment.
The relevant environmental documents, including the Environmental Action Plan or Environmental Assessment Matrix can be obtained from the project manager at the address below.
Any person wishing to make representations in relation to the likely environmental effects of the proposed improvement works should do so, in writing, to the address specified below, within 30 days of the date of publication of this notice.
Gemma Hoad, Environment Agency, Kings Meadow House, Kings Meadow Rd, Reading, Berkshire RG1 8DQ.