Basin Road - Announcement of Intention Not to Prepare an Environmental Statement
What is planned?
ENVIRONMENT AGENCY
ANNOUNCEMENT OF INTENTION NOT TO PREPARE AN ENVIRONMENTAL STATEMENT Regulation 5 of the Environmental Impact Assessment Land Drainage
Improvement Works (Amended) Regulations 1999 SI 1999/1783
Capital works on debris screen
The Environment Agency gives notice that it proposes to carry out improvement works to a flood defence asset on a drainage ditch for Heybridge Basin in Essex, which is located close to the Jolly Sailor Public House (NGR TL8726406955). The proposed improvement works comprise the replacement of the existing screen with a new debris screen, which is to be fully compliant with the latest CIRIA C786. Additional works include the installation of lighting and CCTV cameras for improved monitoring as well as upgrades in fencing and restraints to improve operational safety. The Environment Agency considers that the improvement works are not likely to have significant effects on the environment and does not intend to prepare an environmental statement in respect of them.
Outlined as selection criteria for improvement works having a significant effect on the environment in Schedule 2 of The Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999, the characteristics, location and potential impact have been taken into account in this determination. The works will take place near several designated sites of national and international importance.
A Marine Conservation Zone (MCZ) Assessment and a SSSI assessment form have been prepared, determining no potential for significant impact to the SSSI or nearby MCZ. A Habitats Regulations Appropriate Assessment has also been prepared and concluded that there is no adverse impact on integrity of the sites expected from these works.
An Environmental Action Plan, based on an Environmental Assessment Matrix, has been developed to account for any risk of harm to or disturbance of the environment, including potential protected species, trees, flood risk, water quality and local residents. Mitigations will be in place, including strict pollution prevention measures and biosecurity measures to prevent the spread of invasive and non-native species.
The relevant environmental documents can be obtained from the project manager at the address below.
Any person wishing to make representations in relation to the likely environmental effects of the proposed improvement works should do so, in writing, to the address specified below, within 30 days of the date of publication of this notice.
Gemma Hoad, Environment Agency, Kings Meadow House, Kings Meadow Rd, Reading, Berks RG1 8DQ
Need to publish a public notice?