Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Suffolk & Kent - Development Consent Granted for Sea Link Electricity Transmission Project
What is planned?
Department for Energy Security and Net Zero
SEA LINK
THE PLANNING ACT 2008 AND THE INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017
NOTICE OF A DECISION ON AN APPLICATION FOR AN ORDER GRANTING DEVELOPMENT CONSENT FOR EIA DEVELOPMENT
The Secretary of State for Energy Security and Net Zero (“the Secretary of State”) gives notice under regulation 31(2) of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (“the 2017 Regulations”) that a determination has been made on an application made by National Grid Electricity Transmission plc (“the Applicant”) for development consent under the Planning Act 2008 for development that constitutes “Environmental Impact Assessment development” as defined in the 2017 Regulations.
The application is for reinforcement of the electricity transmission network between Kent and Suffolk, with a maximum transmission capacity of up to 2 gigawatts (“GW”). It is a high voltage direct current (“HVDC”) link, from a proposed substation near Sizewell in Suffolk, offshore for approximately 122 km, to the existing Richborough to Canterbury 400 kilovolt overhead line (“OHL”) close to Richborough in Kent.
The Secretary of State has decided, following consideration of the report of the Examining Authority who conducted an examination into the application, that development consent should be granted for the Proposed Development.
The statement of reasons for deciding to make an Order granting development consent, which has been prepared by the Secretary of State under section 116 of the Planning Act 2008 and regulation 31(2) of the 2017 Regulations, containing the content of the decision, the requirements imposed in connection with the development, the main reasons and considerations on which the decision is based including relevant information about the participation of the public, a description of the main features to avoid, reduce and offset any major adverse effects of the development, is published on the Planning Inspectorate’s website: https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020026
The statement of reasons contains the information required by regulation 30(2) of the 2017 Regulations including information regarding the right to challenge the decision and the procedures for doing so.
Hard copies of the decision documentation will also be available to inspect at the Planning Inspectorate’s offices (by appointment using the contact details below):
The Planning Inspectorate, National Infrastructure Directorate, Temple Quay House, 2 The Square, Temple Quay, Bristol BS1 6PN, England.
To make an appointment for inspection of the documents contact the Planning Inspectorate on 0303 444 5000 or email NIEnquiries@planninginspectorate.gov.uk.
Copies of the Secretary of State’s decision letter and the text of the Order can be obtained by writing or sending an e-mail to the Planning Inspectorate. No charge will be made for this service.
Need to publish a public notice?
If you need to publish a public notice, please contact East Anglian Daily Times directly at: