Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Broadwater Farm, Tottenham - Highway Stopping Up For Redevelopment
What is planned?
LONDON BOROUGH OF HARINGEY
TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED)
THE LONDON BOROUGH OF HARINGEY (STOPPING UP OF HIGHWAYS) (GLOUCESTER ROAD) ORDER 2026
The LONDON BOROUGH OF HARINGEY hereby gives notice that it proposes to make an order under Section 247 of the above Act to authorise the stopping up of following public highway at Gloucester Road and footpath, Broadwater Farm, N17 [G] which is shown double hatched on the plan attached to the draft order:
“an area of highway at Gloucester Road (grid reference 532898.701 E 190130.9954 N) and comprising a maximum length of 75 metres and a maximum width of 9 metres”.
IF THE ORDER IS MADE, the stopping up will be authorised to enable the development described in the Schedule to be carried out in accordance with the planning permission granted under Part II of the above Act on 7 March 2023 with planning reference HGY/2022/0823.
COPIES OF THE DRAFT ORDER AND THE RELEVANT PLAN MAY BE INSPECTED FREE OF CHARGE during the 28 days commencing on 13 May 2026 at the Council’s offices at ground floor reception Alexandra House, 10 Station Road, Wood Green, London N22 7TR between the hours of 9 am and 5 pm Monday to Friday excluding bank holidays and public holidays (Tel. 07989 224 012 or by requesting a copy of the order and map via e-mail transport.planning@haringey.gov.uk quoting reference Gloucester Road SUO 2026).
ANY PERSON MAY OBJECT to the making of the proposed order within 28 days commencing on 13 May 2026 by written notice/e-mail to the Head of Transport & Travel, Alexandra House, 10 Station Road, Wood Green, London N22 7TR or via e-mail transport.planning@haringey.gov.uk (quoting reference Gloucester Road SUO 2026).
In preparing any objection it should be borne in mind that the substance of it may be imparted to other persons who may be affected by it and that those persons may wish to communicate with the objector about it.
Dated: 13 May 2026 Director of Legal and Governance
THE SCHEDULE
Demolition of the existing buildings and structures and erection of new mixed-use buildings including residential (Use Class C3), commercial, business and service (Class E) and local community and learning (Class F) floorspace; energy centre (sui generis); together with landscaped public realm and amenity spaces; public realm and highways works; car-parking; cycle parking; refuse and recycling facilities; and other associated works. Site comprising; Tangmere and Northolt Blocks (including Stapleford North Wing); Energy Centre; Medical Centre; Enterprise Centre; and former Moselle school site, at Broadwater Farm Estate. Demolition of all existing buildings comprising Selby Centre and erection of four buildings. New buildings to comprise of residential accommodation (Use Class C3); and ancillary commercial accommodation (Use Class E (a), (b), & (g)). With car and cycle parking; new vehicle, pedestrian, and cycle routes; new public, communal, and private amenity space and landscaping; and all associated plant and servicing infrastructure.
Open to feedback
From
13-May-2026
To
9-Jun-2026
Need to publish a public notice?
If you need to publish a public notice, please contact Enfield Independent directly at: