Buckinghamshire, Multiple Roads, Temporary Closures Due To Various Works
What is planned?
BUCKINGHAMSHIRE COUNCIL
THE COUNCIL HAS MADE
(Cherry Tree Ln, Fulmer) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Cherry Tree Ln for approx. 156M. Alternative route: Alderbourne Ln, Fulmer Common Rd, Cherry Tree Ln and vice versa. The closure is required whilst pole testing commences on 29 January 2026. The proposed order will come into operation on 29 January 2026, as signed, with maximum 18 months duration.
(Bockmer Rd, Bockmer) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Bockmer Rd for approx. 45M. Alternative route: Bockmer Rd, Main Rd, Chisbridge Ln, Frieth Rd, Lower Woodend Rd, Bockmer Ln and vice versa. The closure is required whilst a new water connection commences on 21 January 2026. The proposed order will come into operation on 21 January 2026, as signed, with maximum 18 months duration.
(Sampsons Hill, Coleshill) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Sampsons Hill for approx. 88M. Alternative route: Coleshill Ln, The Hill, Whielden Ln, New Rd, Village Rd, Narcot Rd, Barkham Rd and vice versa. The closure is required whilst water mains works commence on 19 January 2026. The proposed order will come into operation on 19 January 2026, as signed, with maximum 18 months duration.
(Various Rds, South Bucks/Chilterns) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in the following Rds: Bowyer Rd, Village Rd, Lake End Rd, Dorney: Fulmer Ln, Gerrards Cross: Hedgerley Hill, Hedgerley: Iver Ln, Iver: Bangr Hill, Seer Green. The closure is required whilst surface dressing prep works commence on 1 Jan 2026. PLEASE NOTE: The full duration of this multi-order is to allow co-ordination of a number of works, and flexibility due to weather-dependent nature. The actual times that each Rd will be closed for will be much less than the full order and may be on day or night works only. The full details will be published on one.network when confirmed, with signs on the affected Rd erected two weeks before the closure. The proposed order will come into operation on 1 Jan 2026, as signed, with maximum 18 months duration.
(Various Rds, Wycombe) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in the following Rds. Lodge Hill, Dunsmore: Marlow Rd, Little Marlow: Wash Hill, Wooburn Green: Wycombe Rd, Saunderton: Upper Icknield Way, Saunderton: Mundaydean Ln, Marlow. The closure is required whilst surface dressing prep works commence on 1 Jan 2026. PLEASE NOTE: The full duration of this multi-order is to allow coordination of a number of works, and flexibility due to weather-dependent nature. The actual times that each Rd will be closed for will be much less than the full order and this could be either day or night works only. The full details will be published on one.network when confirmed, with signs on the affected Rd erected two weeks before the closure. The proposed order will come into operation on 1 January 2026, as signed, with maximum 18 months duration.
(Chalkshire Rd, Butlers Cross) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Chalkshire Rd for approx. 38M. Alternative route: Nash Lee Rd, Chalkshire Rd, Ellesborough Rd, Missenden Rd, Lodge Hill, Hampden Rd, Cobblerhill Ln, Upper Icknield Wy, London Rd, Wendover Bypass, Small Dean Ln, Temporary HS2 Rd from Nash Lee Rd to Wendover Bypass, and vice versa. The closure is required whilst a new replacement connection is made on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Grove Rd, Beaconsfield) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Grove Rd for approx. 21M. Alternative route: Grove Rd, Station Rd, Burkes Crescent and vice versa. The closure is required whilst a mains connection commences on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Farnham Park Ln, Farnham Royal) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Farnham Park Ln for approx. 137M. Alternative route: Farnham Park Ln, Parsonage Ln, Park Rd, Beaconsfield Rd and vice versa. The closure is required whilst Thames Water works commence on 6 January 2026. The proposed order will come into operation on 6 January 2026, as signed, with maximum 18 months duration.
(Marsham Ln, Gerrards Cross) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Marsham Ln for approx. 167M. Alternative route: Station Rd, Packhorse Rd, Marsham Way and vice versa. The closure is required whilst a box repair commences on 6 January 2026. The proposed order will come into operation on 6 January 2026, as signed, with maximum 18 months duration.
(Tilehouse Ln, Denham) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Tilehouse Ln for approx. 814M. The closure is required whilst a full repair patch commences on 11 January 2026. The proposed order will come into operation on 11 January 2026, as signed, with maximum 18 months duration.
(High St, Marlow) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in High St for approx. 80M. Alternative route: High St, Market Square, Spittal St, Chapel St, Little Marlow Rd, Marlow Rd, A404, Temple Ln, Bisham Rd and vice versa. The closure is required whilst bridge works commence on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Beeches Rd, Farnham Common) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Beeches Rd for approx. 94M. Alternative route: Green Ln, Kingsway, Beaconsfield Rd and vice versa. The closure is required whilst Cityfibre ducting and chamber building works commence on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Green Ln, Farnham Common) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Green Ln for approx. 40M. Alternative route: Green Ln, Kingsway, Beaconsfield Rd, Beeches Rd and vice versa. The closure is required whilst Cityfibre ducting and chamber building works commence on 7 January 2026. The proposed order will come into operation on 7 January 2026, as signed, with maximum 18 months duration.
(Hitchcroft Rd, High Wycombe) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Hitchcroft Rd for approx. 28M. Access maintained. The closure is required until 02.05m works commence on 8 January 2026. The proposed order will come into operation on 8 January 2026, as signed, with maximum 18 months duration.
(The Hill, Amersham Hill) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in The Hill for approx. 36M. Alternative route: The Hill, Whielden Ln, The Common and vice versa.
The closure is required whilst UKPN new service connection works commence on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Lower Rd, Loosley Row) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Lower Rd for approx. 58M. Alternative route: Lower Rd, Loosley Hill, Woodway and vice versa. The closure is required whilst Thames Water comms diversion works commence on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Ashmead Ln, Denham) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Ashmead Ln for approx. 34M. Alternative route: Ashmead Ln, Cheapside Ln, Village Rd and vice versa. The closure is required whilst Affinity Water repair/replacement pipework works commence on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(North Orbital Rd, Denham) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in North Orbital Rd for approx. 68M. Alternative route: North Orbital Rd, Moorfield Rd and vice versa. The closure is required whilst UK Power Group on behalf of BTU Ltd cable cut and build commences on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Whaddon Rd, Nash) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Whaddon Rd for approx. 83M. Alternative route: Whaddon Rd, Stratford Rd, Winslow Rd, Nash Rd, Bletchley Rd, Codmmor Ln, Stock Ln and vice versa. The closure is required whilst Openreach pole installation commences on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Gordon Rd, High Wycombe) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Gordon Rd for approx. 72M. Alternative route: Gordon Rd, London Rd, Frances Dove Way, Abbey Way Gyratory, Queen Victoria Rd, Easton St, Crendon St, Totteridge Rd, Totteridge Ave and vice versa. The closure is required whilst Thames Water defect repair works commence on 9 January 2026. The proposed order will come into operation on 9 January 2026, as signed, with maximum 18 months duration.
(Deep Mill Ln, Little Kingshill) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Deep Mill Ln for approx. 38 meters. Alternative route: London Rd, Nags Head Ln, Windsor Ln and vice versa. The closure is required whilst Cadent Gas works commence on 5 January 2026. The proposed order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
THE COUNCIL INTENDS TO MAKE
(Station Parade, Denham) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Station Parade for approx. 127M. The closure is required whilst Cityfibre installing ducting works commence on 5 January 2026. The proposed Order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Hedsor Hill, Hedsor) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Hedsor Hill, Hedsor for approx. 727M. Alternative route: Hedsor Rd, Furzeground Rd, Cores End Rd, Kiln Ln, Windsor End, Ltn, Wooburn Common Rd, Heathfield Rd, Bourne End Rd, Hedsor Hill and vice versa. The closure is required whilst Thames Water defect works commence on 5 January 2026, as signed, with maximum 18 months duration.
(Shepherds Ln, Beaconsfield) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Shepherds Ln for approx. 322M. Alternative route: Shepherds Ln, Wycombe End, London End, Park Ln, Candlemass Ln and vice versa. The closure is required whilst underground cabling works commence on 12 January 2026. The proposed Order will come into operation on 12 January 2026, as signed, with maximum 18 months duration.
(Cliveden Rd, Taplow) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Cliveden Rd for approx. 66M. Alternative route: Cliveden Rd, Hill Farm Rd, Taplow Common Rd, Lent Rise Rd, Green Ln, Bath Rd, Lake End Rd, Berry Hill and vice versa. The closure is required whilst Thames Water works commence on 19 January 2026. The proposed order will come into operation on 19 January 2026, as signed, with maximum 18 months duration.
(Crown Ln, Farnham Royal) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Crown Ln for approx. 70M. Alternative route: Crown Ln, Hawthorn Ln, Green Ln, Kingsway, Beaconsfield Rd, Farnham Rd, Farnham Ln, Blackpond Ln and vice versa. The closure is required whilst a service pipe reconnect commences on 12 January 2026. The proposed Order will come into operation on 12 January 2026, as signed, with maximum 18 months duration.
(Fulmer Rd, Fulmer) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Fulmer Rd for approx. 114M. Alternative route: Fulmer Rd, Windmill Rd, Stoke Common Rd, Gerrards Cross Rd, Windsor Rd, Oxford Rd, Gaviots Green and vice versa. The closure is required whilst a pole replacement commences on 12 January 2026. The proposed Order will come into operation on 12 January 2026, as signed, with maximum 18 months duration.
(West End Ln, Stoke Poges) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in West End Ln for approx. 81M. Alternative route: Park Rd, Church Ln, Grays Park Rd, Rogers Ln and vice versa. The closure is required whilst cabling works commence on 5 January 2026. The proposed Order will come into operation on 5 January 2026, as signed, with maximum 18 months duration.
(Hawks Hill, Bourne End) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Hawks Hill for approx. 143M. Alternative route: Kiln Ln, Brookbank, Cores End Rd, Furlong Rd, Wessex Rd, Heavens Lea, Hedsor Hill, Harvest Hill and vice versa. The closure is required whilst Cityfibre are to chamber to rod/rope works commence on 13 January 2026. The proposed Order will come into operation on 13 January 2026, as signed, with maximum 18 months duration.
(Village Rd, Little Missenden) (Temporary Prohibition of Through Traffic) Order, 2025
which will temporarily prohibit any vehicle from proceeding, except for access, in Village Rd for approx. 131M. Alternative route: Amersham Rd, Village Rd and vice versa. The closure is required whilst sewer connection to prevent flooding in property works commence on 26 January 2026. The proposed Order will come into operation on 26 January 2026, as signed, with maximum 18 months duration.