SSE Ferrybridge August 2025

WF11 8DXPublished 28/08/25
Goole Times

What is planned?

FERRYBRIDGE NEXT GENERATION POWER STATION

Notice of proposed application for a development consent order pursuant to the

Planning Act 2008 for the Ferrybridge Next Generation Power Station

The Infrastructure Planning (Applications: Prescribed Forms and Procedure)

Regulations 2009 - Regulation 4 (as amended)

The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 13

1. Notice is hereby given in accordance with section 48 of the Planning Act 2008 (the 'PA 2008’)

that SSE Hydrogen Developments Limited (the ‘Applicant’), whose registered office is No. 1 Forbury

Place, 43 Forbury Road, Reading, England, RG1 3JH, is proposing to submit an application to the

Secretary of State for Energy Security and Net Zero (the ‘SoS') for a Development Consent Order

(‘DCO’) pursuant to section 37 of the PA 2008 to authorise the construction, operation and

maintenance of an up to two gas turbine (‘GT’) unit generating station with a combined capacity of

up to 1.2 gigawatts (‘GW’) electrical output, together with a natural gas pipeline connection, above

ground installation (‘AGI’) and other associated development (the 'Proposed Development'). The

Proposed Development will be known as Ferrybridge Next Generation Power Station and is also

referred to in this notice as the ‘Proposed Development’.

2. The Proposed Development would be located on land at, and in the vicinity of, the former

Ferrybridge Power Station, Kirkhaw Lane, Knottingley, West Yorkshire – within the administrative

area of Wakefield Metropolitan District Council (‘WMDC’) at Easting: 447642, Northing: 424655

(‘the Main Site’), and a land corridor extending eastwards beneath the River Aire and into the

administrative area of North Yorkshire Council (‘NYC’) (‘the Site’) terminating at Pale Lane to the

south of Gateforth. In total the Site extends to approximately 698.5 hectares.

3. The Proposed Development will consist of up to two GT units arranged in either open or

combined cycle configurations, or a combination, depending on market requirements, and

associated infrastructure. The Proposed Development will be designed to run on 100% hydrogen.

However, it is currently anticipated that the hydrogen supply chain may not be available at the start

of operation, in which case the Proposed Development would also need to be able to operate using

100% natural gas or a blend of hydrogen and natural gas. This scenario would be required until

such time as a technically and commercially viable hydrogen supply chain option becomes available

to the Site.

4. Gas will be transported from the Gas Transmission System to the Main Site via a gas pipeline

connection corridor extending into North Yorkshire. The Proposed Pipeline Corridor comprises two

route options for where the pipeline may be located to transport gas from the Gas Transmission

System to the Main Site. Only one corridor would be developed, and the resultant underground

gas pipeline connection is expected to be approximately 9 to 10km in total length.

5. The Proposed Development is anticipated to consist of up to two GT units fuelled by hydrogen

fuel with a combined capacity of up to 1.2 GW electrical output. The main parts are described

below:

• Main Site (at Ferrybridge) - the area where the generating station infrastructure will be located

and supporting facilities;

• Proposed Pipeline Corridors - connecting the Main Site to the existing Feeder 29 on the Gas

Transmission System, for the supply of gas to fuel the power station. Two corridors are currently

under consideration, referred to as the Northern Pipeline Corridor and the Southern Pipeline

Corridor. Only one corridor would be developed and the resultant underground gas pipeline

connection is expected to be approximately 9 to 10km in total length;

• Above Ground Installations (AGIs) including one AGI located at the point of connection with the

National Gas Transmission System at Gateforth and up to two on-site AGIs to receive hydrogen

gas;

• Water Connection Corridors;

• Electrical Connection Corridors - to connect the Proposed Development to the adjacent existing

Ferrybridge 275kV substation; and

• Construction laydown areas.

6. The DCO will also seek, if required, the compulsory acquisition of land and/or rights in, on, under

or over land required for the Proposed Development and the temporary occupation of land for the

Proposed Development.

7. Other powers that the DCO would seek, if required, include the extinguishment and/or overriding

of easements and other rights over or affecting land required for the Proposed Development; the

application and/or disapplication of legislation relevant to the Proposed Development; tree and

hedgerow removal; the temporary stopping up or diversion of public footpaths during construction

works; the permanent and temporary alterations to the highway network for and in the vicinity of

the Project Site, and such ancillary, incidental and consequential works, provisions, permits,

consents, waivers or releases as are necessary and convenient for the successful construction,

operation and maintenance of the Proposed Development.

8. The Proposed Development is an ‘EIA development’ for the purposes of The Infrastructure

Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’). The

Applicant has notified the Planning Inspectorate on behalf of the SoS in writing pursuant to

Regulation 8(1)(b) of the EIA Regulations that it intends to provide an Environmental Statement

(‘ES’) in respect of the Proposed Development as part of the proposed application.

9. Information so far compiled about the Proposed Development’s environmental impacts is

contained in a Preliminary Environmental Information Report (‘PEIR’) and summarised in a Non-

Technical Summary. This document and other documents relating to the Proposed Development,

including plans and maps showing the nature and location of the Proposed Development (‘the

Consultation Documents’), are available to view or download free of charge from the document

library on the Project website www.ssethermal.com/FBNG from 5 September 2025 (please note,

besides the SoCC, documents will not be available before this period).

10. If you have any questions or queries in relation to the Consultation Documents, please

telephone: 0800 211 8028 (24hr voicemail service) or email: FBNG@sse.com. You can request a

paper copy of the Consultation Documents free of charge (with the exception of the full PEIR which

will be charged at 50p per page to a maximum of £500). Please allow a week for receipt of any

paper copies of documents.

11. The Consultation Documents can also be inspected free of charge at locations set out below:

Inspection Location

Address

Opening Times

(all closed Sundays

and Bank Holidays)

Contact Details

Selby Library

52 Micklegate,

Selby,

YO8 4EQ

onday: 9:30am-7:30pm;

Tuesday: 9:30am-5:30pm;

Wednesday: 9:30am-5:30pm;

Thursday: 9:30am-12:30pm;

Friday: 9:30am-5:30pm;

Saturday: 9:30am-12:30pm

T: 01609 534521

E: selby.library@

northyorks.gov.uk

Wakefield Council

Offices

Wakefield Council

Offices,

Wakefield One,

Burton Street,

Wakefield,

WF1 2EB

Monday: 9am - 5pm;

Tuesday: 9am - 5pm;

Wednesday: 9am - 5pm;

Thursday: 9am - 5pm;

Friday: 9am- 4.30pm;

Saturday: Closed

T: 03458 506 506

E: customerservices@

wakefield.gov.uk

Pontefract Library

Shoemarket,

Pontefract

WF8 1BD

Monday: 9:30am-7pm

Tuesday: 9:30am-5pm

Wednesday: 9:30am-6pm

Thursday: closed

Friday: 9:30am-5pm

Saturday: 9:30am-4pm

T: 01977727692

E: pontefractlibrary@

wakefield.gov.uk

Airedale Library

The Airedale Centre,

The Square,

Castleford

WF10 3JJ

Monday: 9:30am-5pm

Tuesday: 9:30am-5pm

Wednesday: 9:30am-7pm

Thursday: closed

Friday: 9:30am-5pm

Saturday: 9:30am-1pm

T: 01977 724040

E: airedalelibrary@

wakefield.gov.uk

Castleford Library

Carlton Street

Castleford

WF10 1BB

Monday: 9am-5pm

Tuesday: 9am-5pm

Wednesday: Closed

Thursday: 9am-5pm

Friday: 9am-5pm

Saturday: 9am-4pm

T: 01977 722085

E: castlefordlibrary@

wakefield.gov.uk

The Consultation Documents will be available at the above locations from Friday 5 September 2025

to Monday 6 October 2025 (please note, besides the SoCC, documents will not be available before

this period).

Responding to this notice

12. If you wish to respond to this consultation or make comments or representations in respect of

the Proposed Development, these should be sent to the Applicant in writing. The feedback form

outlines topics where feedback is requested, but consultees are welcome to give feedback on any

aspect of the Project. Comments and representations may be submitted in the following ways:

Feedback Form: at the Project Website (www.ssethermal.com/FBNG) from Friday 5 September

2025 and available at our consultation events, details of which are available online

Email: FBNG@sse.com

Post: FREEPOST FBNG

If you have any problems accessing information please leave us a message on 0800 211 8028.

13. Consultation responses will be reviewed and taken into consideration by the Applicant and may

be published in anonymised form as part of our Consultation Report. We are committed to

protecting your personal data in line with applicable data protection legislation. For more information

about how we handle your personal data, please review our privacy notice at

https://www.ssethermal.com/privacy-notice/.

14. Please note that all comments and representations must be received by the Applicant no later

than 11.59pm on Monday 6 October 2025.

SSE Hydrogen Developments Limited

August 2025

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 42 million people across the length and breadth of the country each month.