Malvern Hills - Multiple Planning Applications
What is planned?
The Town and Country Planning
(General Development Procedure) (England) Order 2015
Planning (Listed Buildings and Conservation Areas)
Act 1990 Sections 67 & 73
Notice is hereby given that the following applications have been submitted to the Council.
The Codes are as follows: ASCON Affecting the Setting of Conservation Area ASLB Affecting the Setting of Listed Building ASLCO Affecting Setting of Listed Building in Cons Area CONLB Conservation Area and Listed Building PRW Footpath – Public Right of Way
M/25/01158/FUL Croome D’abitot CP PRW
Reconfiguration of existing car park, erection of visitor welcome building and associated works.
Croome Park Croome D’abitot Severn Stoke
M/25/01180/HP Kempsey CP PRW
Proposed addition of first floor and ground floor side and rear extension.
Greenlands Green Street Kempsey
M/25/00737/FUL M/25/00736/LB Malvern CP CONLB
Replacement of existing external terrace surface / roof over basement level and erection of replacement balustrade railings to rear.
Addition of condenser to external south facing wall. Replacement of canopy to front elevation.
Foley Arms Hotel 14 Worcester Road Malvern
M/25/01048/FUL Malvern CP ASLCO
Construction of one detached dwellinghouse with off road parking (including two parking spaces to serve 22 St Ann’s Rd)
Land At (Os 7742 4600) St Anns Road Malvern
M/25/01138/LB Powick CP ASLCO
Stabilise a section of retaining boundary wall using Wall Anchors
Virginia House 40 The Village Powick
M/25/01000/HP Powick CP ASLB
Erection of gazebo, summerhouse, shed and greenhouse and associated works
28 Upton Road Callow End
M/25/01032/HP Upton-upon-Severn CP ASCON
Loft conversion with rear dormer
11 Minge Lane Upton Upon Severn
A copy of the above listed applications, plans and other documentation can be viewed at www.malvernhills.gov.uk or alternatively at the address below. Any objections or representations concerning the proposal may be sent to Planning and Infrastructure at the address below to reach them on or before 30/08/2025
CIARAN POWER
HEAD OF DEVELOPMENT MANAGEMENT
The Council House, Avenue Road, Malvern, WR14 3AF
Monday–Friday 9.00am–3:00pm.
Malvern Hills District Council
Open to feedback
From
8-Aug-2025
To
30-Aug-2025
Need to publish a public notice?
If you need to publish a public notice, please contact Malvern Gazette directly at: