Public Notice Portal - Brought to you by Britain's Local News Media
Planning

Green Hill Solar Farm - Infrastructure Planning Development Consent Order

NN6 0NSPublished 03/07/25
Milton Keynes Citizen • 

What is planned?

Green Hill Solar Farm
Notice of Acceptance of an application for a Development Consent Order (“DCO”) by the Planning Inspectorate (on behalf of the Secretary of State)
under Section 56 of the Planning Act 2008.
Regulation 9 of The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009.
Regulation 16 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.

1. Notice is hereby given that the Secretary of State has accepted an application (the “Application”) by Green Hill Solar Farm Limited (Company registration number 13362769) of Unit 25.7 Coda Studios, 189 Munster Road, London, England SW6 6AW (the “Applicant”) for a Development Consent Order (“DCO”) under the Planning Act 2008. The Application (Reference No. EN010170) was submitted by the Applicant to the Secretary of State via the Planning Inspectorate on 23 May 2025 and was accepted for examination on 19 June 2025.
Summary of the Proposed Development
2. The Application is for development consent to construct, operate, maintain and decommission a solar photovoltaic (PV) generating station, with a generating capacity of more than 50MW (AC) and associated infrastructure on land within the administrative areas of West Northamptonshire Council, North Northamptonshire Council and Milton Keynes City Council.

3. Green Hill Solar Farm (the “Proposed Development”) will consist of the following:

Green Hill A, A.2, B, C, D, E, F, G, and Green Hill BESS: eight solar array sites and a dedicated battery energy storage system (BESS) site. The solar array sites will include solar panels, conversion units, inverters and 132 kilovolt (kV) substations in Green Hill A, B, E, F and G, and two 400 kV substations, located in Green Hill C and Green Hill BESS. 
A battery energy storage system at the Green Hill BESS and/or Green Hill C sites.
Underground electricity cables within a cable corridor connecting the Green Hill sites, substations and the energy storage system to the National Grid substation at Grendon. 
Associated infrastructure, mitigation and enhancement measures, and other ancillary works including fencing, security, local grid connections, temporary access roads, permanent means of access, highway works, temporary works compounds and work sites.

4. The sites are located across several parishes and administrative areas:

Green Hill A and A.2 are located in the parishes of Old and Walgrave and in the administrative area of West Northamptonshire, approximately 600m north of Walgrave.
Green Hill B is located within the parish of Holcot and in the administrative area of West Northamptonshire, approximately 1.2km northeast of Moulton.
Green Hill C is located within parishes of Sywell and Mears Ashby and in the administrative area of North Northamptonshire, approximately 1km northeast of Sywell.
Green Hill D is located within the parish of Mears Ashby and in the administrative area of North Northamptonshire, 240m east of Green Hill C.
Green Hill E is located within the parishes of Mears Ashby and Wilby in the administrative area of North Northamptonshire, east of Mears Ashby and approximately 500m north of Earls Barton.
Green Hill F is located within the parishes of Easton Maudit and Bozeat in the administrative area of North Northamptonshire, to the north, east and south of Easton Maudit and approximately 300m west of the village of Bozeat.
Green Hill G is located within the parishes of Warrington and Lavendon in the administrative area of Milton Keynes, approximately 500m northwest of Lavendon.
Green Hill BESS is located within the parish of Grendon and in the administrative area of North Northamptonshire, approximately 600m northwest of Grendon.

5. A map showing the location of the Proposed Development can be viewed on the Planning Inspectorate’s National Infrastructure Planning website at the following link:

https://nsip-documents.planninginspectorate.gov.uk/published-documents/EN010170-000108-GH2.1_Location%20Plan.pdf



6. Development consent is required to the extent that development is or forms part of a Nationally Significant Infrastructure Project (NSIP) pursuant to sections 14(1)(a) and 15(1) and 15(2) of the Planning Act 2008. As an onshore generating station in England with a capacity greater than 50 MW (AC), the Proposed Development falls within the remit of the Secretary of State’s decision-making powers.

7. The DCO, if granted, would authorise the compulsory acquisition of land, interests in land and rights over land, and the powers to use land permanently and temporarily. The DCO would also authorise alterations to the layout of streets, the construction of accesses to the Proposed Development, the temporary stopping up or management of the public rights of way, street works, removal of hedgerows and the application and disapplication of legislation.
Environmental Impact Assessment Development
8. Due to its nature and size, the Proposed Development is classified as an Environmental Impact Assessment (“EIA”) development for the purposes of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017. This means that the Proposed Development constitutes development for which an EIA is required. The Application is therefore accompanied by an Environmental Statement.
Application form and accompanying documents
9. The Application form and its accompanying documents (including accompanying plans, maps, the Environmental Statement, and the draft Order (the “Application Documents”)) can be viewed and downloaded free of charge online on the Green Hill Solar Farm page of the Planning Inspectorate’s National Infrastructure Planning website under the Documents tab until at least the end of the Relevant Representation period on 14 August 2025:

https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010170


10. This link will also be available on the Applicant’s project website:

https://greenhillsolar.co.uk/



11. An electronic copy of the Application documents can be supplied free of charge on a USB memory stick. To request a USB, please email

info@greenhillsolar.co.uk,

write to FREEPOST GREEN HILL SOLAR FARM (free of charge; no need for a stamp) or telephone 0800 012 9882 (free of charge).

12. Application documents can be made available in hard copy format on request to the Applicant. Document requests can be made using the contact details at the bottom of this notice. Please note that reasonable printing costs may apply. Requests may be made for documents in bespoke or alternative formats (for example in large print, audio or braille formats) or specific individual documents. Given the size and format of the Application documents, a full suite of documents to publication specifications will cost £5,000.
Making Representations
13. Becoming an Interested Party gives you the right to make representations about the Application to the Planning Inspectorate. Any person may register as an Interested Party by submitting a Relevant Representation on the Application during the representation period, which must be made directly to the Planning Inspectorate. Any representations (giving notice of any interest in, or objection to, the Application) must be made on the Planning Inspectorate’s Registration and Relevant Representation Form. The Registration and Relevant Representation Form can be accessed and completed online from 3 July 2025 on the Planning Inspectorate’s website:

https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010170


14. If you require guidance, or other methods to obtain and complete a hard copy of the Planning Inspectorate’s Registration and Relevant Representation Form, please telephone 0303 444 5000. Completed forms should be sent to The Planning Inspectorate, Room 3/OP, Temple Quay House, 2 The Square, Temple Quay, Bristol BS1 6PN. The Application reference (EN010170) should be quoted in any correspondence.

15. The government guidance ‘Nationally Significant Infrastructure Projects: How to register to have your say and make a relevant representation’ provides further information and can be accessed via the following link:

https://www.gov.uk/guidance/nationally-significant-infrastructure-projects-how-to-register-to-have-your-say-and-make-a-relevant-representation



16. Please note that representations must be received by the Planning Inspectorate by 11:59pm on 14 August 2025.

17. It should be noted that personal data, such as the name of persons over 18, will be published alongside a representation. If you do not wish personal data to be made publicly available, you should state why when submitting the representation. If necessary, the Planning Inspectorate will publish the representations with your name and personal data redacted. Please note that all representations submitted will be published on the Planning Inspectorate’s website and will be subject to their privacy policy, found online here:

https://www.gov.uk/government/publications/planning-inspectorate-privacy-notices/customer-privacy-notice


Contact us
18. Further information about the Application may be obtained from the Applicant through the contact details provided below.

info@greenhillsolar.co.uk

FREEPOST GREEN HILL SOLAR FARM
0800 012 9882



Need to publish a public notice?

If you need to publish a public notice, please contact Milton Keynes Citizen directly at:

publicnotices@nationalworld.com

02070237931

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 42 million people across the length and breadth of the country each month.

Public Notice PortalNews Media Association