South Norfolk, Multiple Planning Applications.
What is planned?
SOUTH NORFOLK COUNCIL
TOWN AND COUNTRY PLANNING
(DEVELOPMENT MANAGEMENT PROCEDURE)
(ENGLAND) ORDER 2015,
NOTICE UNDER ARTICLE 13,
PLANNING (LISTED BUILDING AND CONSERVATION AREAS) ACT 1990
The following applications have been submitted to the Council:
2024/1663 STOKE HOLY CROSS, Greenacres, Ipswich Road - Removal of Condition 1 of permission FH8235 - Agricultural Occupancy Condition
Reason(s): Affects TPO site,
2024/1741 BRAMERTON, Midsomer Lodge, The Street - Erection of post Midsomer Lodge, The Street - Erection of post and rail fencing and gates.
Reason(s): Affects a Conservation Area,
2024/1720 & 2024/1719 WORTWELL, Land West Of Farmland Manor High Road - Outline permission for 4no detached chalet-style dwellings with access, parking, layout, amenity space and associated works with all other matters reserved
Reason(s): Does not accord with development plan
2024/1793 & 2024/1792 CAISTOR ST EDMUND & BIXLEY, Long Barn Markshall Lane - Proposed front single storey extension and insertion of velux window to rear elevation
Reason(s): Listed Building and/or curtilage,
2024/1659 SHELFANGER, Fieldview, Common Road - Erection of single storey side extension
Reason(s): Listed Building and/or curtilage,
2024/1759 WRAMPLINGHAM, 3 The Bowers, The Street - Proposed porch ground floor rear and first floor side extensions
Reason(s): Affects a Conservation Area,
2024/1230 NORTON SUBCOURSE, 1 Church Farm Cottages, Croft Road - Oak framed two bay cart lodge, framed garden shed and replacement of fence with 2.5m double brick wall with arched opening
Reason(s): Listed Building and/or curtilage,
2024/1740 HINGHAM, 9 Hall Moor Road, Hingham - Two storey rear extension with single storey lean-to extension
Reason(s): Affects a Conservation Area,
2024/1734 SWARDESTON, Land East of Main Road - Variation of conditions of permission 2022/0867 (Construction and operation of Energy Balancing Infrastructure (EBI) comprising energy storage technology, to form up to two areas of modular or containerised structures. To include containerised or modular battery array, transformers and inverter area, switchgear and contro room building(s), connection of EBI plant to the Hornsea Three Onshore Converter Station (ONCS), required access and internal roads, drainage systems, perimeter and internal fences, and required external lighting and lightning pylons. Development is located within the Hornsea Three ONCS area as consented by the Hornsea Project Three Offshore Wind Farm Development Consent Order (DCO) in December 2020. The application is accompanied by an environmental statement.) - Condition 2 - Approved Plans, Condition 4 - Construction Traffic Management Plan, Condition 6 - Drainage Strategy Condition 7 - Code of Construction Practice, Condition 9 - Soft Landscape works, Condition 10 - Ecological Mitigation, Condition 11 - Tree Protection
Reason(s): Environmental statement submitted, Major development,
2024/1498 HEMPNALL, The Long House, The Street - Installation of solar panels to rear elevations, 4no roof lights in main roof to rear elevation and replacement windows to same style, 4 No. roof lights in main roof on rear elevation
Reason(s): Listed Building and/or curtilage, Affects a Conservation Area,
Applications can be viewed at The Horizon Centre Broadland Business Park Peachman Way Norwich NR7 0WF or online at www.southnorfolkandbroadland.gov.uk. All comments must be received within 21 days of this Notice (excluding Bank Holidays) and can be sent to planning@southnorfolkandbroadland.gov.uk. Comments made will be open to public inspection and available to view on the Council's website. They will be forwarded to the Planning Inspectorate n the case of an Appeal. Please see our Privacy Notice on our website for further details.
Ben Burgess AD Planning
Dated: 27th June 2024
Open to feedback
From
27-Jun-2024
To
18-Jul-2024
Need to publish a public notice?
If you need to publish a public notice, please contact Eastern Daily Press directly at: