Public Notice Portal - Brought to you by Britain's Local News Media
Other

Try our AI Explainer

This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.

Carmarthenshire - Intention to Proceed With Drainage Works Without Preparation of an Environmental Statement Regulation

SA14 8AYPublished 09/09/26
Llanelli Star Series • 

What is happening?

BWRIAD I FWRW YMLAEN Â GWAITH DRAENIO HEB BARATOI DATGANIAD AMGYLCHEDDOL

RHEOLIAD 5 O REOLIADAU ASESU EFFEITHIAU AMGYLCHEDDOL (GWAITH GWELLA DRAENIO TIR) 1999 (fel y’u diwygiwyd)

Cynllun Lliniaru Llifogydd Pentre-poeth: Gwaith i wella ac atgyweirio / cyfnewid y system ddraenio

Mae Cyngor Sir Caerfyrddin (“Y Cyngor”) yn RHOI RHYBUDD ei fod yn bwriadu gwneud gwaith draenio dŵr wyneb am oddeutu 183 metr ger Llwybr Beicio Dyffryn y Swistir Rhif 47 a Hawl Tramwy Cyhoeddus 36/144/1.

• Bydd y gwaith arfaethedig yn cynnwys y canlynol:

• Cloddio’r bibell bresennol a gosod Findrain yn ei lle

• Gwaith ailbroffilio i greu bwnd bach

• Gosod cefnfur i gludo dŵr wyneb i’r rhwydwaith

• Disodli cefnfur yr ollyngfa

Mae’r gwaith gwella yn rhan o Raglen Rheoli Perygl Llifogydd ac Erydu Arfordirol y Cyngor. Mae’r cynllun yn cael ei ariannu gan Lywodraeth Cymru a Chyngor Sir Caerfyrddin, ac yn cael ei reoli gan Dîm Amddiffyn rhag Llifogydd a Diogelu’r Arfordir y Cyngor. Nod y gwaith yw rhyng-gipio dŵr wyneb yn llifo cyn iddo gyrraedd y llwybr beicio a Heol Trubshaw a Heol Bwcle gan leihau’r perygl o lifogydd.

Gan gyfeirio at Atodlen 2 y rheoliadau, ar ôl ystyried lleoliad a nodweddion y cynllun, a’r math o effeithiau posibl a’u nodweddion, mae’r Cyngor o’r farn nad yw’r gwaith gwella draenio yn debygol o gael effeithiau sylweddol ar yr amgylchedd. Mae adroddiadau ac arolygon a baratowyd fel rhan o’r cynllun wedi pennu nad oes unrhyw effeithiau amgylcheddol sylweddol tebygol ar yr ardal gyfagos. Felly, nid yw’r Cyngor yn bwriadu paratoi Datganiad Amgylcheddol mewn perthynas â’r gwaith.

Mae’r cynllun wedi ymgymryd ag Arfarniad Ecolegol Rhagarweiniol ac arolwg ar droed o ran cyfyngiadau Ecolegol. Gellir gofyn am y lluniadau dylunio prosiect a’r adroddiadau amgylcheddol gan: Kieron McCullar, Cyngor Sir Caerfyrddin, Waun Dew, Parc Myrddin, SA31 1HQ, KPMcCullar@sirgar.gov.uk

Dylai unrhyw un sy’n dymuno cyflwyno sylwadau i’r Cyngor mewn perthynas ag effeithiau amgylcheddol tebygol y gwaith gwella arfaethedig wneud hynny drwy ysgrifennu i’r cyfeiriad a nodir isod, cyn pen 30 diwrnod i ddyddiad cyhoeddi’r hysbysiad hwn. Y bwriad yw gwneud y gwaith rhwng mis Hydref a mis Rhagfyr 2026.

Rhodri D Griffiths – Pennaeth Lle a Chynaliadwyedd, Lle a Seilwaith Cyngor Sir Caerfyrddin, 7/8 Heol Spilman, Caerfyrddin, SA31 1JY

Dyddiedig: 9 Medi 2026

Adeiladu Twmpath Ffordd Newydd – Heol Copperworks, Llanelli

HYSBYSIR TRWY HYN fod Cyngor Sir Caerfyrddin (y cyfeirir ato o hyn ymlaen fel ‘y Cyngor’), drwy arfer y pwerau a roddir gan Adran 90A o Ddeddf Priffyrdd 1980 (y cyfeirir ati fel ‘y Ddeddf’ o hyn ymlaen), a’r holl bwerau galluogi eraill, ac ar ôl ymgynghori â Phrif Swyddog yr Heddlu a’r cyrff neu’r personau hynny a bennir gan Reoliadau Priffyrdd (Twmpathau Ffyrdd) 1999 (y cyfeirir atynt fel ‘y Rheoliadau’ o hyn ymlaen) yn unol ag Adran 90C(1) o’r Ddeddf, ac yn unol ag Adrannau 90C(2) a 90C(3) o’r Ddeddf, yn bwriadu adeiladu twmpath ffordd ar ffurf croesfan estynedig heb ei rheoli ger Rhif 7 Heol Copperworks yn Llanelli, Sir Gaerfyrddin.

Mae’r cynnig presennol yn disodli’r un oedd mewn Hysbysiad dyddiedig 3ydd Rhagfyr 2025, a oedd yn cyflwyno cynnig i adeiladu twmpath estynedig ger Rhif 5 Heol Copperworks (wedi’i amlinellu’n goch ar y cynllun sydd ynghlwm wrth yr Hysbysiad hwn). Mae’r groesfan yn cael ei hail-leoli yn dilyn adborth gan Banel Hygyrchedd Trafnidiaeth Cymru.

Mae lleoliad y twmpath ffordd estynedig newydd ger Rhif 7 Heol Copperworks wedi’i ddangos ar y cynllun sydd ynghlwm wrth yr Hysbysiad hwn, ac wedi’i amlinellu yn ddu a’i liwio’n llwyd.

Dimensiynau’r twmpath ffordd arfaethedig fydd:

• uchder o 75 milimetr (0.075 metr), yn unol â’r amrywiadau a ganiateir yn y Rheoliadau (lle na fydd twmpath yn fwy na 100 milimetr o uchder);

• brig gwastad sy’n mesur 3000 milimetr (3 metr) o hyd; a

• rampiau ar yr esgyniad i’r twmpath arafu estynedig a’r disgyniad ohono sy’n mesur 1125 milimetr (1.125 metr) o hyd.

Gellir gweld manylion llawn y cynnig, ynghyd â chynllun a datganiad o resymau’r Cyngor dros fynd ati i weithredu’r mesur fertigol hwn, yn swyddfa HWB Gwasanaethau Cwsmeriaid y Cyngor yn Rhif 36, Stryd Stepney, Llanelli SA15 3TR yn ystod oriau swyddfa arferol.

Hefyd, gellir:

• gweld y dogfennau hyn ar wefan y Cyngor ar https://www.sirgar.llyw.cymru/cartref/cyngor-a-democratiaeth/hysbysiadau-cyhoeddus; neu

• gael copi am ddim drwy ysgrifennu at y Rheolwr Gwasanaethau Dylunio Proffesiynol yn Adeilad 2, Parc Myrddin, Waun Dew, Caerfyrddin SA31 1HQ, neu drwy e-bostio ENTrafficManagement@sirgar.gov.uk.

Os hoffech wrthwynebu’r cynnig uchod, anfonwch eich rhesymau dros wrthwynebu yn ysgrifenedig:

• drwy’r post – at Bennaeth y Gyfraith, Llywodraethu a’r Gwasanaethau Sifil yn Neuadd y Sir, Caerfyrddin, SA31 1JP; neu

• drwy e-bost – HeMDavies@sirgar.gov.uk, erbyn y 1af o Hydref 2026, gan ddyfynnu’r cyfeirnod ffeil isod. Rhaid i bob gwrthwynebiad neu sylwad arall nodi’r rhesymau dros ei wneud.

Cofiwch - gall yr holl lythyrau a dderbynnir gael eu hystyried yn gyhoeddus gan y Cyngor a gallai’r cyhoedd weld cynnwys y llythyrau, ynghyd ag enw a chyfeiriad y person sy’n llunio’r llythyr.

Cyfeirnod y Ffeil: HMD/HTTR-2107

Llinell Uniongyrchol: 01267 224066

E-bost: HeMDavies@sirgar.gov.uk

Dyddiedig y 9fed dydd hwn o Fedi, 2026.

Wendy Walters, Y Prif Weithredwr, Neuadd y Sir, Caerfyrddi

INTENTION TO PROCEED WITH DRAINAGE WORKS WITHOUT PREPARATION OF AN ENVIRONMENTAL STATEMENT REGULATION 5 OF THE ENVIRONMENTAL IMPACT ASSESSMENT (LAND DRAINAGE IMPROVEMENT WORKS) REGULATIONS 1999 (as amended)

Pentrepoeth Flood Alleviation Scheme: Works to improve and repair/ replace the drainage System Carmarthenshire County Council (“The Council”) GIVES NOTICE that it proposes to carry out surface water drainage works for approximately 183 metres adjacent to the Swiss Valley Cycle Route Path Number 47 and the 36/144/1 Public Right of Way.

The proposed works will involve the following:
• Excavation of existing pipe and replacing with a Findrain
• Reprofiling works to create a small bund
• Installation of headwall to convey surface water into the network
• Replace outfall headwall

The improvement works form part of the Council’s Flood and Coastal Erosion Risk Management programme. The scheme is funded by the Welsh Government and Carmarthenshire County Council, and managed by Council’s Flood Defence and Coastal rotection Team. The work aims to intercept surface water run off before it gets to the cycle path and Heol Trubshaw & Heol Buckley reducing flood risk.

With reference to Schedule 2 of the regulations, having considered the location and characteristics of the scheme, and the type and characteristics of the potential impacts, the Council believes that the drainage improvement works are not likely to have significant effects on the environment. Reports and surveys prepared as part of the scheme have determined that there are no likely significant environmental effects on the surrounding area. Therefore the Council does not intend to prepare an Environmental Statement in respect of the works.

The scheme has undertaken a PEA (Preliminary Ecological Appraisal) and an Ecological constraints walkover. The project design drawings and environmental reports can be requested from: Kieron McCullar, Carmarthenshire County Council, Richmond Terrace, Parc Myrddin, SA31 1HQ, KPMcCullar@carmarthenshire.gov.uk

Any person wishing to make representations to the Council in relation to the likely environmental effects of the proposed improvement works should do so, in writing, to the address specified below, within 30 days of the date of publication of this notice. The works are scheduled to be undertaken between October - December 2026.

Rhodri D Griffiths – Head of Place and Sustainability, Place and Infrastructure Carmarthenshire County Council, 7/8 Spillman Street, Carmarthen SA31 1JY

Dated: 9 September 2026

Construction of a New Road Hump – Copperworks Road, Llanelli

NOTICE IS HEREBY GIVEN that Carmarthenshire County Council (hereinafter referred to as ‘the Council’), in exercise of the powers conferred by Section 90A of the Highways Act 1980 (hereinafter referred to as ‘the Act’) and of all other enabling powers, and after consultation with the Chief Officer of Police and those bodies or persons prescribed by the Highways (Road Humps) Regulations 1999 (hereinafter referred to as ‘the Regulations’) in accordance with Section 90C(1) of the Act, and in accordance with Sections 90C(2) and 90C(3) of the Act, intends to construct a road hump in the form of a raised uncontrolled crossing adjacent to Number 7 Copperworks Road in Llanelli, Carmarthenshire.

The current proposal supersedes that advertised in a Notice dated 3rd December 2025, which put forward a proposal to construct a raised plateau adjacent to Number 5 Copperworks Road (outlined in red on the plan annexed to this Notice). The crossing is being repositioned following feedback from the Transport for Wales Accessibility Panel.

The location of the proposed new raised plateau road hump adjacent to Number 7 Copperworks Road is shown on the plan annexed to this Notice outlined in black and shaded grey.

The dimensions of the proposed road hump will be:

• a height of 75 millimetres (0.075 metres), in line with the tolerances permitted in the Regulations (where a hump should not exceed 100 millimetres in height);

• a flat top measuring 3000 millimetres (3 metres) in length; and

• ramps on the approach to and descent from the raised plateau measuring 1125 millimetres (1.125 metres) in length.

Full details of the proposal, together with a plan and a statement of the Council’s reasons for seeking to implement this vertical measure, may be examined at the office of the Council’s Customer Service HWB at No.36 Stepney Street, Llanelli SA15 3TR during usual office hours.

The documents can also be:

• viewed on the Council’s website at https://www.carmarthenshire.gov.wales/home/council-democracy/public-notices; or

• obtained free of charge by writing to the Professional Design Services Manager at Block 2, Parc Myrddin, Richmond Terrace, Carmarthen SA31 1HQ, or by emailing ENTrafficManagement@carmarthenshire.gov.uk.

Should you wish to object to the above proposal, please send your grounds for objection in writing:

• by post – to the Head of Law, Governance & Civil Services at County Hall, Carmarthen, SA31 1JP; or

• by e-mail – to HeMDavies@carmarthenshire.gov.uk, by the 1st October 2026, quoting the file reference below. All objections or other representations must specify the grounds on which they are made.

Please note - all letters received may be considered in public by the Council and the content of letters, together with the name and address of the person making it, could become available for public inspection.

File Reference: HMD/HTTR-2107

E-mail: HeMDavies@carmarthenshire.gov.uk

Direct Line: 01267 224066

Dated this 9th day of September 2026.

Wendy Walters, Chief Executive, County Hall, Carmarthen

Need to publish a public notice?

If you need to publish a public notice, please contact Llanelli Star Series directly at:

publicnoticesteam@reachplc.com

01227 907972

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 42 million people across the length and breadth of the country each month.

Public Notice PortalNews Media Association