Sandwell - Various Temporary Road Works
What is happening?
The Borough Council of Sandwell (Potters Lane, Wednesbury)
(Temporary Road Closure) Order 2024 intends to temporarily prohibit
vehicles from proceeding along Potters Lane between Perry Street and the
entrance to the Midland Metro Alliance Compound. Diversion routes will be
signed as follows: access to the western side of Potters Lane via Holyhead
Road, Dudley Street and Potters Lane, and access to the eastern side of
Potters Lane via Victoria Street, Holyhead Road and Bridge Street. The
maximum duration is 18 months but the work is expected to be completed
by 29/03/2024 effective from 22/03/2024 (8pm – 5am only). Purpose –
to facilitate the installation ofacrane into the Midland Metro Alliance
Compound. For more information please contact Andrew Dimitrov of
Midland Metro Alliance – 07787 254866.
The Borough Council of Sandwell (Perry Street, Tipton) (Temporary Road
Closure) Order 2024 intends to temporarily prohibit vehicles from proceeding
along Perry Street between Park Lane East and the extended line of the rear
fence to No.31 Park Lane East. Traffic will be diverted via Perry Street, Barnett
Street, Park Lane East and vice-versa. The maximum duration is 18 months
but the work is expected to commence and be completed by 25/03/2024.
Purpose – to facilitate the rectification ofacarriageway defect following on
from previous works by CASS Ltd (working on behalf of British Telecom). For
more information please contact Karolina Earls of CASS Ltd – 07514 004130
The Borough Council of Sandwell (Grange Road, Smethwick) (Temporary
Road Closure) Order 2024 intends to temporarily prohibit vehicles from
proceeding along Grange Road between Waterloo Road for a distance of 30
metres in an easterly direction. Diversion routes will be signed as follows: to
the north of the closure via Waterloo Road and Sycamore Road. To the south
of the closure via Sycamore Road, Dorset Road, Willow Avenue, Sandon Road,
Bearwood Road and Waterloo Road. The maximum duration is 18 months but
the work is expected to be completed by 26/03/2024 effective from
25/03/2024 (9.30am - 3.30pm only). Purpose – to facilitate the laying
of a new track and building ofanew telecoms chamber by Vodafone. For
more information please contact Melissa Holloway of BRM Utility Services
(working on behalf of Vodafone)–07415 833559.
The Borough Council of Sandwell (Queen’s Road, Smethwick)
(Temporary Road Closure) Order 2024 intends to temporarily prohibit
vehicles from proceeding along the following lengths of Queens Road:
Queens Road from its junction with Basons Lane foradistance of 40 metres
in a southerly direction (anticipated dates 28/03/2024 – 19/04/2024).
Queen’s Road from its junction with Warley Road roundabout for a distance
of 50 metres in a northerly direction (anticipated dates 03/05/2024 –
17/05/2024). Diversion routes will be signed for both road closures: on the
western side of the closures via Warley Road, Basons Lane and vice-versa.
Onthe eastern side of the closures via Manor Road, Londonderry Lane and
vice-versa. The maximum duration is 18 months but the work is expected
to be completed by 17/05/2024 effective from 28/03/2024. Purpose –
to facilitate works to replace old cast iron gas mains by Cadent Gas Ltd.
For more information please contact Kirsty Melia of Trinity (working on behalf
of Cadent Gas Ltd)–07866 051273.
The Borough Council of Sandwell (Simpson Street and McKean Road,
Oldbury) (Temporary Road Closures) Order 2024 intends to temporarily
prohibit vehicles from proceeding along Simpson Street/McKean Road
from the access road (northern side) to the Oldbury Health Centre to outside
property No.124 McKean Road and Simpson Street, which will be closed from
the junction of Birmingham Street to the access road (southern side) to the
Oldbury Health Centre. Access to any affected frontages, including the Health
Centre, will be maintained but only when safety permits. Traffic will be
diverted via Birmingham Street, Oldbury Ringway, Birmingham Road,
Broadwell Road, Century Road and vice-versa (Simpson Street/McKean Road
closures). A 2nd diversion route will be signed via Birmingham Street, Church
Street, Bromford Road, Century Road and vice-versa (Simpson Street closure
only). The maximum duration is 18 months but the work is expected to be
completed by 05/04/2024 effective from 23/03/2024 (24hr). Purpose –
to facilitate access to lay a duct for new 132KV electrical service cable by
Excalon on behalf of National Grid Electricity Distribution.
The Borough Council of Sandwell (Station Road, Oldbury) (Temporary
Road and Footway Closures) Order 2024 intends to temporarily prohibit
vehicles from proceeding along Station Road between the junctions of
Western Road (eastern side) and Thompson Road (western side). The order
also temporarily prohibits pedestrians proceeding along Station Road as
detailed in the location above. Access to any affected frontages will be
maintained, but only when safety permits. Traffic will be diverted and will be
signed via Crosswells Road, Vicarage Road, Tat Bank Road, Western Road and
vice-versa. A pedestrian diversion route will be signed via Thompson Road,
New Henry Street, Langley Green Road, Mill Lane and vice-versa. The maximum
duration is 18 months but the work is expected to be completed by 24/03/2024
effective from 23/03/2024 (10pm – 9am). Purpose – to facilitate access for
the renewal of a level crossing pedestal by Network Rail.
The Borough Council of Sandwell (Baldwin Street, Smethwick)
(Temporary Road Closure) and (Soho Way, Smethwick) (Temporary
No Right Turn Restriction) Order 2024 intends to temporarily prohibit
vehicles from proceeding along Baldwin Street from the junction of Soho Way
to the gable end of property No.4, and temporarily prohibits vehicles from
turning right from Soho Way (eastbound) to Baldwin Street. Access to any
affected frontages will be maintained, but only when safety permits. A traffic
diversion route for access to Baldwin Street will be signed via Soho Way
(eastbound), Soho Way (westbound), Crocketts Lane, Brook Street and Cutler
Street. A traffic diversion route for access to Soho Way from Baldwin Street
will be signed via Cutler Street, Brook Street and Crocketts Lane. The maximum
duration is 18 months but the work is expected to be completed by 23/04/2024
effective from 25/03/2024 (24hr). Purpose – to facilitate access for cycle
route works to install a new kerb line along Soho Way and a raised
carriageway crossing point in Baldwin Street at the junction of Soho Way,
by Fitzgerald Civil Engineering Contractors on behalf of Sandwell MBC.
How long will it take?
Planned start
14-Mar-2024
Estimated end
28-Mar-2024
Open to feedback
From
14-Mar-2024
To
17-May-2024
Need to publish a public notice?
If you need to publish a public notice, please contact East Zone directly at: