Tillbridge Solar Limited - to provide a new solar energy and storage scheme
What is happening?
Notice of Consultation
Tillbridge Solar
Section 47 Planning Act 2008
Notice Publicising a Statement of Community Consultation
Tillbridge Solar Limited (“we”) intends to provide a new solar energy and storage scheme (the “Scheme”) within the administrative boundary of West Lindsey District Council and Lincolnshire County Council, with the grid connection infrastructure also located within the administrative boundary of Bassetlaw District Council and Nottinghamshire County Council.
As the proposed generating capacity exceeds 50 megawatts (MW), the Scheme, known as Tillbridge Solar, is classified as a Nationally Significant Infrastructure Project (NSIP) under the Planning Act 2008 (the “Act”).
The Scheme will consist of:
the construction, operation (including maintenance) and decommissioning of ground mounted solar photovoltaic (PV) panel arrays to generate electricity located on a “Principal Site” approximately five kilometres (km) to the east of Gainsborough and approximately 13 km to the north of Lincoln.
A Battery Energy Storage System (BESS) located on the Principal Site, allowing for the generation, storage, import and export of electricity to the national electricity transmission network.
Supporting electrical infrastructure on the Principal Site, including up to two substations (with a 400 kilovolt (KV) underground cable circuit interconnecting the two).
A Cable Route Corridor, comprising underground 400 kV cables connecting the Principal Site in West Lindsey, Lincolnshire, to National Grid’s Cottam substation in Bassetlaw, Nottinghamshire.
Associated infrastructure, mitigation and enhancement measures/green infrastructure, and other ancillary works, for example, fencing, security, local grid connections, temporary access roads, permanent means of access, highway works, temporary works compounds and work sites.
Statement of Community Consultation (SoCC)
We will apply to the Secretary of State, via the Planning Inspectorate, for a Development Consent Order (DCO), which would authorise the construction of the scheme under Section 37 of the Planning Act 2008 (the Act).
In accordance with Section 47 of the Act, before making our application, we have produced a SoCC, setting out how we will consult with the local community about our proposals. The statement is available to the public at the local information points (listed below) between Tuesday 30 May and Tuesday 11 July 2023. Following our provision of the SoCC, we will carry out the consultation in accordance with the SoCC.
This notice contains information on where and when the SoCC can be inspected and provides a summary of the consultation details. Full details of the consultation can be found in the SoCC. The SoCC can be viewed online, alongside our consultation materials,
at www.tillbridgesolar.com/documents-library or at the following local information points during our consultation period (from Tuesday 30 May until Tuesday 11 July 2023). Hard copy documents (including the SoCC) can also be requested by contacting the project team using the details in this notice.
Local information points
For the table of contents please see PDF below
*These libraries also have computer and internet access. We recommend contacting the venues to check the opening times before visiting.
Public information events
You can also view printed copies of our consultation materials (including the SoCC) at our public information events, where you can speak with our team and share your views. The events will be held at the following venues:
For the table of contents please see PDF below
Online events
In addition to the above in-person events, we are holding two webinar events on:
Wednesday 7 June 2023 between 6.30pm and 8pm
Monday 10 July 2023 between 6.30pm and 8pm
Members of the public can join the webinars via telephone or online. To register for a webinar please visit www.tillbridgesolar.com or get in touch using the contact details below. These events will have a question-and-answer facility with members of the project team available to respond during the webinars.
Preliminary Environmental Information
The Scheme is an Environmental Impact Assessment (EIA) development for the purposes of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017, which means a Preliminary Environmental Information (PEI) Report has been produced (to describe the environmental effects of the Scheme) and is being consulted on, alongside the other consultation documents, as well as a Non-Technical Summary (NTS) of the PEI Report. It also means that an Environmental Statement (ES) will be produced and submitted with the application in due course.
Feedback
You can provide your feedback on the Scheme and the information included in the consultation materials to us either online or in writing, by:
Going to our website and completing an online feedback questionnaire – www.tillbridgesolar.com – you can access the form directly by visiting (www.tillbridgesolar.com/documents-library)
Collecting a questionnaire from one of our consultation events, information points (listed above), or on request (by contacting us by email, phone or post)
Returning your completed questionnaire to us at one of our events, by email (info@tillbridgesolar.com) or by post (by writing ‘FREEPOST TILLBRIDGE SOLAR’ on a blank envelope – please note you do not need a stamp)
Providing your free form comments by email or post. Please note that we will not accept comments over the phone, however we can assist you wherever possible.
The deadline for comments is 23.59 on 11 July 2023.
If you require materials in an alternative format (e.g. large print or braille) please let us know.
Contact us
You can also contact us via email, over the phone, or by post.
Email us at: info@tillbridgesolar.com
Call our Freephone information line on: 0800 046 9643
Write to us at: FREEPOST TILLBRIDGE SOLAR (please note that you do not need a stamp).
To find out more about Tillbridge Solar and take part in our statutory consultation go to the project website: www.tillbridgesolar.com
Need to publish a public notice?
If you need to publish a public notice, please contact Lincolnshire World directly at: